12
Cable connections
1. Locate the mounting template at the installation position and drill the ceiling or
wall if needed.
2. Place junction box part on pre-drilled position and fix it through mount holes
(x3) by using mount screws.
3. Route the dome cable to the junction part and attach the dome to the surface
mount part using assembly screws as shown.
4. Connect the dome cable with the power source then organize the connected
cables.
5. Put the junction part cover to the unit and tighten the assembly screws.
1. Untwisted the gland cap and route
the cables from the ceiling or wall.
Then plug up the other holes of
gland using the gland hole plugs
supported. Put the cables with
gland onto the side of the tilted
junction mount as illustrated.
2. Refer to the signal assignment when
the power source cable connect
with the dome cables.
Cable through with the gland on the side
Cable through with the grommets on the bottom
1. Tear off the cocks of grommets and
route the cables from the ceiling or
wall. Then put the cables with grom-
mets onto the bottom of the tilted
junction mount as illustrated.
2. Refer to the signal assignment when
the power source cable connect
with the dome cables.
Summary of Contents for AK-5 Callisto dome series
Page 1: ...Installation Guide Camera junction box for Callisto dome series AK 5 DE EN FR PL RU...
Page 30: ...30 30 30 31 31 31 32 33 33 33 34 34 HDcctv 34 35 35 36...
Page 32: ...32 32 Callisto 1 3 IP66 229 85 82 155 3 58 7 34 6 130...
Page 33: ...33 DE EN FR PL RU 33 DE EN FR PL RU 1 2 x3 3 4 5 1 2 1 2...
Page 34: ...34 34 1 2 HDcctv Ethernet...
Page 35: ...35 DE EN FR PL RU 35 DE EN FR PL RU Ethernet 24 12 24 24 12 24 RS485 RTX RS485 RTX 1 2 3...
Page 36: ...36 36 www eneo security com...
Page 37: ...37 DE EN FR PL RU 37 DE EN FR PL RU...
Page 38: ...38 38...