Installation guidelines
1.1
Before Installing
This document describes how to install
Enelion
Vertica
charging station.
Before any installation work is performed, study all
drawings furnished by the supplier for the particular
installation.
1.2
Safety Requirements
Ensure that at all times when working,
no power is connected.
•
Eye protection with appropriate glasses
(especially when using the electrical drill).
•
In the installation be sure to not connect directly
to power distribution network cables without
additional protection.
•
Use appropriate tools for each function.
1.3
Delivery content – packages
Charging station is delivered to a client in separate
packages containing:
•
Case – steel construction with attached alumin-
ium profiles, connection for 3x400V (3P+N+PE)
and top cover with two security screws -
fig.2
•
Two panels with electric elements, electronics
and a socket or a charging cable (depends on
a charger’s version) -
fig.3
•
Foundation preparation kit (if ordered) -
fig.4
•
Set of screws for panels installation, a key for
security screws, 2 RFID cards, 2 RFID key holders.
Upon receipt of shipment, examine the
package for damage. If the shipping
container must be opened outdoors,
take proper precautions to prevent the
entrance of moisture.
fig.3
fig.4
fig.2
Enelion
VERTICA
Installation manual ver. 1.6, © Enelion 05.2017
Installation guidelines
5