Operating the generator
The operation of the generator is described in this section.
4.1
Transporting and setting up the
generator
Proceed as follows to transport the generator.
These requirements must be met:
The generator must be turned off
The generator must have cooled down.
WARNING!
A slipping or falling device can crush hands or feet.
Take the weight of about 320kg into account.
Transport the device only with a crane or forklift, as de-
scribed below.
Hang the crane's hooks in the generator's transport
1.
hooks
(see Figure 3-1-(5))
.
Transport with the crane to the use location.
2.
Slowly lower the device and remove the hooks.
3.
The generator has been transported.
4.
Insert the fork on the device's long side.
1.
Slowly lift the device and move it to its use location.
2.
Slowly lower the device.
3.
The generator has been transported.