Turbimax CUS52D
Commissioning
Hauser
23
7
Commissioning
7.1
Function check
Prior to initial commissioning, ensure that:
• The sensor is correctly installed
• The electrical connection is correct.
‣
Before commissioning, check the chemical compatibility of materials, the temperature
range and the pressure range.