Construction and preparation of CYK 71 cable with examples for connection
13
13
12
12
11
11
14
14
15
15
16
16
17
17
ϑ
ϑ
Cd
/ M
Ω
Cd
/ M
Ω
ϑ
ϑ
bk
bk
gn wt ye
3 1
2
3 4
2 1
gn wt ye
gn
wt
ye
gn
wt
ye
LM431C2E.CDR
Fig. 3.14
Connection examples
Left:
Connection of measuring
cell CLS 19 with CYK 71
Right:
Connection of measuring
cell CLS 12 with CYK 71
7
6
3
8
5
4
2
1
Warning:
Semiconductor layer must
be removed down to inner
screen for connection!
LM431K71.CDR
Fig. 3.13
Construction / preparation
of special measuring
cable CYK 71
1 Inner conductor
(measuring signal)
2 Inner insulation
3 Black semiconductor
layer
4 Inner screen
(measuring signal)
5 2nd insulation
6 Auxiliary cores for
Pt 100 (gn/wt/ye)
7 Outer insulation
8 Outer screen
LM431CE3.CHP
mypro CLM 431 / CLD 431 conductive
Installation
Hauser
15
Summary of Contents for mypro CLD 431
Page 2: ......