Micropilot S FMR540 4 to 20 mA HART
Commissioning
Hauser
43
6
Commissioning
6.1
Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist "Post installation check",
24.
• Checklist "Post connection check",
6.2
Switching on the measuring device
When the device is switched on for the first time, the following messages appear in a sequence of
5 s on the display: software version, communication protocol and language selection.
⇒
Select the language
(this message appears the first time the device is switched on)
⇓
Select the basic unit
(this message appears the first time the device is switched on)
⇓
The current measured value is displayed
⇓
After
F
is pressed, you reach the group selection
This selection enables you to perform the basic setup
E HAUSER