Installation
Micropilot S FMR540 4 to 20 mA HART
24
Hauser
3.4.5
Alignment unit with Hauser UNI flange
L00-FMR540xx-06-00-00-en-008
Please, also see sensor alignment tool
60.
3.5
Post-installation check
After the measuring device has been installed, perform the following checks:
• Is the measuring device damaged (visual check)?
• Does the measuring device correspond to the measuring point specifications such as process
temperature/pressure, ambient temperature, measuring range, etc.?
• Is the flange marking correctly aligned (
10)?
• Have the flange screws been tightened up with the respective tightening torque?
• Are the measuring point number and labeling correct (visual check)?
• Is the measuring device adequately protected against rain and direct sunlight (
A-A
8
A
A
±
15°
56.8
Hauser UNI flange
DN200/DN250
Viton seal
AF 90