3. After checking the operation of LT, remove the cover of the 90° sheave elbow for the
seal pot and inject the liquid sealant.
Note that checking the operation of LT after filling it with liquid sealant may
cause the liquid sealant to leak through the measuring tape.
1
A
B
C
A0041219
52
Filling the seal pot with liquid sealant
A
Scale for liquid sealant
B
To the LT5 side
C
To the tank
1
90 ° sheave elbow
4. Fill up to the middle of the scale for liquid sealant.
5. Close the 90 ° sheave elbow cover.
This completes the liquid sealant filling process.
Approximately 2 l (L) of liquid sealant is included with the kit. When injecting the
proper amount of liquid sealant, a small amount will remain in the bottle. Do not
dispose the remaining liquid sealant, as it is used as needed once the tank begins to
operate.
1
2
A
B
C
A0041220
53
Amount of liquid sealant
A
Scale for liquid sealant
B
To the LT5 side
C
To the tank
1
Liquid sealant
2
90 ° sheave elbow cover
If the tank is run without liquid sealant, LT and the sheave elbow's packing or o-ring,
etc., may corrode due to gas contained in the tank, and this may cause a malfunction.
Be sure to inject liquid sealant prior to tank operation.