Operation options
FieldEdge SGC500
16
Hauser
2. Connect the positive pole of the supply voltage to terminal 3 (+).
Connecting the supply voltage: → 16
6.2.2
Connecting the LAN ports
Connecting the LAN ports: → 16
6.3
Post-connection check
Is the device undamaged (visual inspection)? Are the cables undamaged (visual inspection)?
Does the supply voltage match the specification on the nameplate?
Was the supply voltage connected correctly?
7
Operation options
The SGC500 can be connected for local configuration via a notebook with a network
connection. The SGC500 can be configured with a Web browser like Chrome or Firefox.
8
System integration
System integration is via Netilion and is performed automatically in the background, as
described. As soon as an Internet connection has been established for the SGC500, the
SGC500 is visible in the Netilion Cloud and can be controlled from there.
9
Commissioning
9.1
Connecting the SGC500
9.1.1
Separate connections for Internet and field network
• We recommend using different networks for the Internet and the field network, as
described in this section.
• The system firewall settings do not block authorized requests from the Internet to the
field network and allow access to Netilion via
https://*.netilion.endress.com
.
https://api.netilion.endress.com
and
https://downloads.netilion.endress.com
are used.