
Maintenance
Cleanfit CPA875
28
Hauser
5.4.1
Molded seal - process connection (A)
a0022115
Fig. 23:
Replacing seals, Part 1
1
Securing screws
1. Release the four securing screws (
pos. 1).
a0023400
Fig. 24:
Replacing seals, Part 2
2
Process connection
3
Gasket
4
Service chamber
5
Molded seal
8
Immersion tube
2. Remove the process connection (pos. 2).
3. Remove the molded seal (pos. 5) from the
process connection
4. Apply a thin layer of grease to the new
molded seal (e.g. Klüber Paraliq GTE 703).
5. Slide the molded seal over the immersion
tube (pos. 8) and into the guide groove of
the service chamber. Ensure that the
molded seal is seated correctly.
6. Position the gasket (pos. 3) on the service
chamber.
7. Place the process connection on the service
chamber.
8. Tighten the four securing screws with a
torque of 4 Nm.