www.
en
c
loscreens
.com
10
ASSEMBLY
INSTRUCTIONS
ZP19008
Level the screen as
necessary, and backfill
excavated dirt.
If your ground is really hard, you
may need to dig a hole large enough
to accommodate one post from
each panel into the same hole -
Approximately 8” in diameter and 10”
deep
. Backfill and compact the dirt.
Level
STEP 4.5
STEP 4.6