www.
en
c
loscreens
.com
5
ASSEMBLY
INSTRUCTIONS
ZP19008
STEP 2:
ASSEMBLE
SCREEN FRAME
Position the
two Posts
(B)
as
illustrated, and
slide the top and
middle rails down
over the posts
(towards the locking
tabs)
.
Align the pre-drilled holes in the
posts with the pre-dilled holes in the
top and middle rails. Fasten together
using (8) ¾" Self-Drilling Stainless
Steel Screws
(I)
.
Guide (14) Pickets
(C)
down through the top and
middle rails. Push down
into the top rail until the
pickets lock into place.
Note:
Top and Bottom Rails only have picket holes on one side.
Top of screen
Align holes
B
G
D
E
D
C
J
Identify the Top and Bottom Rails
(D)
and
Middle Rails
(E)
. Pressure fit the three loose
Rail End Caps
(G)
into the ends of each rail.
STEP 2.1
STEP 2.2
STEP 2.4
STEP 2.3