Step 5: Plug in and connect
the 200A current transformers
Your system will have 1, 2, or 3 main service
cables (a typical 2-main system is shown
below). Open the clasps on the CTs and
place each clamp around one of the main
service cables. Then, shut the clasps to
secure the CTs.
IMPORTANT! The K
→
L
imprint on the bottom of the CTs should
point toward the breakers.
Finally, insert the
200A current transformer audio jacks into the
audio jack ports on the top of the energy
monitor.
WARNING: The service
mains are always live!