background image

 

 

11

 

1 General

 

This control has four outlets. Outlet Heating (16) is for heating,  Outlet Lamp (15) is for the 
transformer of the lamp and Outlet Pump (14) is designated for the pump. Outlet Fan (12) is 
designated for connection of a fan that is only switched on and off. This outlet cannot be 
regulated.

 

Controls and sensors are connected to 5V or 12V controller-voltage (safety extra-low voltage, 
SELV)

 

The Whirlpool is operated by the switch mounted on the edge of the tub. All time values in 
this operating manual serve as guidelines. Should any technical changes be made, all rights to 
guarantee fall away.

 

( )..... terminal block designation

 

 

1.1 DIP-switch description

 

S1 no function 

S2 no function 

S3 Dryer manual/automatic 

S4 Interval on/off 

 

2 Description of the status indicator (LED) at the switch 

If the controller is connected to the power grid, the status indicator (LED – light emitting 
diode) of the pump or fan symbol every 8 seconds for 0.5 seconds = “mains voltage present”. 

When the water in the tub reaches the filling level (hight of TLS) the blinking rhythm of the 
status indicator changes to a constant blinking of 0.5 seconds = “pool ready”. After the “pool 
ready” message appears, all functions can be used. If a function is active, then the LED of the 
respective function will be illuminated. If a function is active after the tub has been emptied 
(according to specification, for example, the dryer with blower) the blinking rhythm of the 
status indicator at the switch will change to double blinking with a 0.5 second pause. If all 
functions have been completed, the status indicator will display the “mains voltage present” 
blinking function. 

 

 

 

Summary of Contents for Optimus 170 Premium left

Page 1: ...1 Optimus 170 Premium left Operating and installation instructions Is there a problem with your product or do you have any questions Please feel free to contact our hotline 020 8528 1729...

Page 2: ...Part names 5 Operating the touch displays 6 Whirlpool control 7 10 Dry running protection and settings 10 11 Heating and secondary drying 11 12 Electrical connection and installation mounting 12 15 C...

Page 3: ...s please take some time to read this manual before installing and starting up carefully Please open the packaging with suitable tools Accessories and sketch 1 x waterfall faucet and gasket 1 x hand sh...

Page 4: ...4...

Page 5: ...ts or heat it in order to avoid damage to the product Clean the spa with a soft cloth and neutral detergent 5 Do not use acidic or alkaline cleaners 6 When entering and exiting the hot tub be careful...

Page 6: ...es 1 Overflow 2 Outflow 3 Side jets 4 Touch display 5 Air injection vent 6 Suction 7 Ground air nozzles 8 Back jets 9 Headrest 10 Waterfall faucet 11 Hot water 12 Changeover switch 13 Cold water 14 Ha...

Page 7: ...7 Using the touch screen 1 Air nozzles 2 Water jets large jet 3 LED Light Therapy...

Page 8: ...230 8014B S03 Rudolf Koller GmbH Type 230 8014B S03 Rudolf Koller Stra e 1 112 Rev 2 A 3902 Vitis Ing Aigner A Tel 43 2841 8207 Fax 43 2841 8221 Email office vitis at rkoller com Technical changes and...

Page 9: ...9...

Page 10: ...10...

Page 11: ...nterval on off 2 Description of the status indicator LED at the switch If the controller is connected to the power grid the status indicator LED light emitting diode of the pump or fan symbol every 8...

Page 12: ...on again immediately after stopping automatically With the first activation of the switch the the run time limits is started anew Automatic functions such as drying and disinfection according to spec...

Page 13: ...ctivation unit ON unit on second switch activation unit interval unit off third switch activation unit OFF see first activation fourth switch activation see first activation 7 Description of the heate...

Page 14: ...ction the switch is to be operated once The function can only be cancelled when the tub is empty 8 1 Drying When the function is activated the fan is switched on for 3 minutes 20 minutes after the dry...

Page 15: ...t the requirements of the protective measure IP55 The outer covers of the conductors cladding must be inserted completely into the cable gland The cap nuts of the cable glands must be tightened in the...

Page 16: ...be carried out by an electrician Furthermore the effectiveness of the implemented safety measures earth and protective conductor connections potential equaliser isolation status etc of the newly erec...

Page 17: ...pleted successfully the final assembly can take place Final assembly 1 Put your hot tub in the intended place of use 2 Now adjust the feet of the hot tub and pay attention to the horizontal alignment...

Page 18: ...cteria 2 Calcium deposits on the surface can be removed with cleaners please also refer to page 4 item 5 for more information 3 For the removal of superficial scratches we recommend the use of 2000s s...

Reviews: