Finishing - Connecting rods positioning. 52
Finishing
1x
PTFE tube
8x
Zip tie
1x
braided sleeve
3x
pad
1x
adhesive tape
1x
M3x50 screw
1x
M3 nut
1x
Ø3 washer
PTFE tube length must be 35cm. cut carefully the end of the PTFE tube if they are flattened
Push the PTFE tube
into the pneufit
Push the PTFE tube
into the pneufit
Push the cables and the PTFE tube
trough the braided sleeve
Fasten the cables with zip ties
PTFE tube
Fold the braided sleeve to
improve the appearance
Summary of Contents for mDelta
Page 1: ...Version 1 2...
Page 8: ...Printed parts 8 Assembly...
Page 12: ...Bill of materials Additional parts 12 1x adhesive tape...
Page 18: ...Mechanical assembly Bottom assembly 18 Nut at the end of the screw eM 1 inside eM 2 top...
Page 45: ...Core Core assembly 45 Unscrew the filament guide Screw the 4xM6mm pneufit...
Page 55: ...Finishing Connecting rods positioning 55 Stick the three pads under the inferior frame...
Page 67: ...Annex 1 Spool holder 67...