Installation of the ionization system consists of conduit 

bars attached to the ceiling of the room with stainless 

steel brackets.  These brackets attach to standard 2' 

x 4" drop ceiling frames with or without HEPA filters.  

The brackets and hangers are mounted to allow the 

changing of lights and filters with minimal interference.

Zone Monitoring and Feedback

Each IRIS power supply incorporates 3 external sensors 

to provide feedback to monitor stability of each zone.  

Each sensor is assigned an alarm threshold.  The 

stability of each zone is controlled by the set duration 

of power to each emitter.  During the initial calibration 

process, the power state is adjusted manually via the 

TEAM5 IRIS Client Software while monitoring the work 

environment with a Charge Plate Monitor until the 

desired conditions are achieved.  The duration of each 

power state is recorded and saved during calibration.  

These values are then used by the client computer to 

control the power supply during normal use.
A sensor alarm is triggered if the sensor or power 

values deviate from the saved calibration value by more 

than the selected alarm range percentage.  A “soft 

alarm” alerts the system operator of the issue without 

turning off the IRIS system.  A “hard alarm” alerts the 

system operator of the issue and turns off the IRIS 

power supply.  A tolerance threshold can be set to alarm 

whenever the room system’s performance shifts too far 

from its calibrated values.  Sensors may be disabled 

due to unordinary maintenance or activity in clean room. 

Maintenance

 

Periodic maintenance including general cleaning, 

emitter pin cleaning and recalibration may be necessary.  

All power supplies must be turned off before any 

maintenance procedures are taken.  The conduits and 

housings may be wiped clean using an all purpose 

cleaner (make sure that all cleaners used are consistent 

with requirements of the controlled environment/

cleanroom and ESD Protected Area).  The emitter 

points should be cleaned using a swab dampened with 

Isopropyl.

TEAM5 IRIS Client Software

The IRIS Power Supply is controlled by a serial 

communication line hard wired to the IRIS Tablet PC 

with TEAM5 IRIS Client Software.  TEAM5 IRIS Client 

Software monitors and displays the feedback from each 

of the three sensors and the high voltage output from 

the power supply.  TEAM5 IRIS Client Software is used 

to set calibration profiles.  A “Factory Default” profile will 

be set at the time of the initial install of IRIS.  Additional 

profiles may be added and saved.

Figure 9. TEAM5 IRIS Client Software in operation on 

the IRIS Touchscreen Tablet PC

TEAM5 IRIS Server Software

TEAM5 IRIS Server Software allows for each zone 

to be monitored remotely.  TEAM5 IRIS Client and 

TEAM5 IRIS Server communication takes place over 

a local area network (LAN).  Multi-zone power cycle 

synchronization allows multiple zones in the same room/

area to be coordinated for optimal performance.

Design and Installation Quotes

EMIT includes application, engineering and sales 

consulting with each IRIS installation.  Each IRIS is 

designed to provide a solution for particular needs of 

a controlled environment.  This includes accurately 

estimating the cost (purchase, installation, and 

maintenance) and layout of the system.  With the quote, 

EMIT will provide layout drawings, system specifications  

and certifications, detailed parts lists and installation 

project plans.  EMIT works directly with its Chino, CA 

factory to coordinate delivery schedules and installation.  

IRIS support is provided throughout its ownership.
For more information, please 

click here

 and complete an 

IRIS Referral Form.

Figure 8. TEAM5 IRIS Client Software screenshot

Summary of Contents for 50849

Page 1: ...the clean room Item Description 50849 IRIS Power Supply 50879 IRIS Tablet PC with TEAM5 IRIS Client Software The EMIT IRIS Room Ionization System meets the ANSI ESD S20 20 2007 required limit less th...

Page 2: ...ication lost between the IRIS Power Supply and IRIS Tablet PC E LCD Display Displays current output voltage F Power Switch Powers the Power Supply G Reset Switch Resets the Power Supply s alarm H IRIS...

Page 3: ...ble ion production when in use Each IRIS Zone is independently controlled by TEAM5 IRIS Client Software TEAM5 IRIS Client Software logs all significant events to a database for ongoing analysis and fo...

Page 4: ...supplies must be turned off before any maintenance procedures are taken The conduits and housings may be wiped clean using an all purpose cleaner make sure that all cleaners used are consistent with...

Page 5: ...nfiguration Calibration The performance of the EMIT IRIS Intelligent Room Ionization System is directly related to uniform airflow throughout the area being ionized Minimum laminar airflow of 70 FPM a...

Page 6: ...ESCO INDUSTRIES INC Employee Owned EMIT 3651 Walnut Avenue Chino CA 91710 909 664 9980 Website DescoEMIT com Figure 10 IRIS Power Supply overall dimensions inches Figure 11 IRIS Power Supply mounting...

Page 7: ...6 DESCO INDUSTRIES INC Employee Owned EMIT 3651 Walnut Avenue Chino CA 91710 909 664 9980 Website DescoEMIT com Figure 12 IRIS Tablet PC overall dimensions inches Figure 13 IRIS Tablet PC mounting bra...

Page 8: ...Page 8 of 9 2016 DESCO INDUSTRIES INC Employee Owned EMIT 3651 Walnut Avenue Chino CA 91710 909 664 9980 Website DescoEMIT com Figure 14 Average room coverage of 5 200 square feet 52 0 100 0 Coverage...

Page 9: ...Website DescoEMIT com Limited Warranty Warranty Exclusions Limit of Liability and RMA Request Instructions See the EMIT Warranty http EMIT DescoIndustries com Warranty aspx Figure 15 IRIS room layout...

Reviews: