YarwaY 

A.T.-Temp CryogeniC desuperheATer 

InstallatIon and MaIntenance InstructIons

inspection procedUre

spray nozzle assemblies (1) and (2), fastener 
rings (5), piston (4), piston rings (32) shall 
be considered wear parts. The materials 
selected are such that they do cope with the 
conditions as found on applications in liquid/gas 
environments of cryogenic conditions. Thermal 
cycling does occur and users should realize 
that the temperature differentials at Cryogenic 
desuperheaters can be significant.
it is recommended to check the spray nozzle 
assembly, with the integrally vacuum brazed 
injection nozzles, fastener ring and tack-welds 
after the first year of service.
At the inspection, by use of dye check or fluor 
penetrant investigation, these parts shall be 
checked for cracks. parts with hair crack 
indications shall not be re-used. ‘defect free’ 
heads in such installations shall be inspected 
once per 2 year of operation.
it is advised to replace the above mentioned 
components at least once per 5 years 
of service.
Taking these precautions has historically 
proven to give reliable service.

note:

 spray nozzle assemblies may have been 

made specifically for the specification. delivery 
time of such components will be 8 weeks.

storage procedUre

upon receipt, check both the A.T.-Temp 
Cryogenic desuperheater and the packing case 
for any transit damage. Any damage to the 
A.T.-Temp Cryogenic desuperheater should be 
reported immediately to yarway or their local 
agent. Any damage to the packing container 
should be rectified to prevent the ingress of 
dust or water, prior to placing the equipment 
into storage.

For long term storage use only a dry indoor 
location. ensure that the A.T.-Temp Cryogenic 
desuperheater is dry and free from moisture. 
retain A.T.-Temp Cryogenic desuperheater in 
its original packing and inspect at 3 monthly 
intervals to ensure that no deterioration 
has occurred.

Before placing the A.T.-Temp Cryogenic 
desuperheater into service, stroke valve 
spindle a few times and inspect other 
components, such as actuator, seals, etc., 
to ensure correct functioning.
Follow the procedure for installation as 
detailed in the operating and maintenance 
instruction manual.

note:

 materials and data of units supplied may 

deviated from this instruction manual. please 
consult order documents in case of doubt.

A.T.-Temp Cryogenic desuperheater is 
classified under european directive 97/23/eC 
under category i or ii with Ce-marking.

Check the information contained on 
the identification plate-tag plate and 
documentation and return the unit to its 
packing with protective covers in place.

For short term storage, up to 6 months 
duration, no additional preservation 
measures are necessary. retain the unit 
in its original packing in a clean, dry indoor 
location. if outdoor storage is unavoidable, 
then the packing case should be enclosed in 
a waterproof covering.

neither emerson, emerson Automation solutions, nor any of their affiliated entities assumes responsibility for the selection, use or maintenance of any product. 
responsibility for proper selection, use, and maintenance of any product remains solely with the purchaser and end user.

yarway is a mark owned by one of the companies in the emerson Automation solutions business unit of emerson electric Co. emerson Automation solutions, 

emerson and the emerson logo are trademarks and service marks of emerson electric Co. All other marks are the property of their respective owners.

The contents of this publication are presented for informational purposes only, and while every effort has been made to ensure their accuracy, they are not to be 
construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by 

our terms and conditions, which are available upon request. We reserve the right to modify or improve the designs or specifications of such products at any time without 

notice.

emerson.com/FinalControl

Summary of Contents for Yarway

Page 1: ...body or use the hoisting lug if provided Do not use the water inlet connection yoke actuator or any of its accessories for lifting Leave the flange covers in place during transportation until ready to install in the pipework When installing the A T Temp Cryogenic desuperheater use gaskets and bolting material in accordance with the relevant piping code for example ASME ANSI B31 3 or EN Place the g...

Page 2: ... Pneumatic or E P positioner Figure 1 Check for damages Check for damages Figure 2 Figure 3 Liquid flange positions Process line Process gas flow Handwheel positions Process line Process gas flow The minimum pipe run required downstream of the A T Temp Cryogenic desuperheater varies with each individual application and would be specified by Yarway at the enquiry stage This straight run is needed t...

Page 3: ...cting to the A T Temp Cryogenic desuperheater mounting flange see Figure 6 Figure 5 Yarway supplies the A T Temp Cryogenic desuperheater as follows Identification number xx 37 xxxxx Fabricated type with non balanced stem xx 47 xxxxx Fabricated type with semi balanced stem and oversized trim all with the spray cylinder tack welded to the body extension pipe Note horizontal orientated A T Temp Cryog...

Page 4: ...rdination between instrument signals and temperature are attained adjustment of the set point can be made and the system transferred to automatic operation It is recommended to record the various process coordinates over a sustained period to verify operation adjusting where necessary Maintenance Note maintenance of the A T Temp Cryogenic desuperheater is straight forward and does not require any ...

Page 5: ...ng wire brush and or honing device Cleanless of the packing area is vital for proper valve sealing Do not use grease or lubricants in combination with PTFE Chevron type packing The actual packing design is mentioned on the project related valve drawing Only ever use genuine Yarway components as they are supplied as matched sets see Figure 9 Disassembly see Figure 8 The A T Temp Cryogenic desuperhe...

Page 6: ... material removed Insert the A T Temp Cryogenic desuperheater into the pipework and check that the nozzle is orientated correctly with the spray with the direction of the gas flow Apply a suitable lubricating compound to the bolts and nuts and tighten evenly in accordance with the manufacturer s recommendations Before connecting the liquid line flush through and check for any contamination or rest...

Page 7: ...plate SA 182 F304L 19 Name plate AISI 316 20 Lock nut Stainless steel 21 Coupling SA 182 F304L 23 Securing washer Stainless steel 24 Vapor flange SA 182 F304 F304L dual certified 25 Guiding PTFE 26 Spring AISI 631 17 7 PH 27 Shoulder bolt SA 320 B8 CL 2 28 Securing washer Stainless steel 29 Flange female SA 182 F304L 30 Flange male SA 182 F304L 31 Extension pipe SA 312 TP304L 32 Piston rings Alumi...

Page 8: ...rred Before placing the A T Temp Cryogenic desuperheater into service stroke valve spindle a few times and inspect other components such as actuator seals etc to ensure correct functioning Follow the procedure for installation as detailed in the operating and maintenance instruction manual Note materials and data of units supplied may deviated from this Instruction Manual Please consult order docu...

Reviews: