Installation
Reference Manual
April 2022-
00809-200-4245
20
Rosemount HMC-C01
Start a document file for each short or damaged shipment, and don’t delay in filing a claim
against the carrier once the amount of damage or loss is known. The time limit is less than
nine months for domestic truck shipments. Claim forms are available from the delivering
carrier.
Plan to have enough room to temporarily store all of the pieces out of the weather. If the
conveyor will not be installed immediately take all necessary precautions to protect your
investment. Lubricate unpainted parts (like shafts), cover the conveyor, and protect it from
being bumped, and store copies of the instructions manual where you can find them later.
Check your shipment to verify that all operating components have arrived safely and that
all parts have been shipped.
3.1.3
Unpacking
Your conveyor will have been shipped on a wooden skid or completely boxed. The drive
components are mounted to the drive section.
Cross-reference your packing slip and/or approval drawings.
In the event, you find a part that you feel you do not need or is not correct for your
conveyor, please contact our Customer Service Department
3.2 Installation
WARNING
HEAVY ITEM
Serious injury or death could occur.
The leak detection system weighs 1250 kg (2756 lb) and should only be lifted or moved by
a minimum of two people using suitably rated lifting/moving equipment.
To prevent crushing of hands, feet, or other body parts always wear suitable protective
gloves and footwear when handling.
The selected installation site must be suitable to support the weight of the leak detection
system, cabling and gas sample lines when installed.
3.2.1
Installation Requirements
Use experienced and trained riggers, millwrights, installers, and licensed electricians.
Supports should be securely added as soon as each section is put into place. Use as many
installers as required for safety. Check machine leveling and adjust it frequently during the
installation. Belt tracking later depends heavily on the levelness of the conveyor.
Summary of Contents for ROSEMOUNT HMC-C01
Page 1: ...Reference Manual 00809 200 4245 Rev AA April 2022 HMC C01CompressionSampleHead ...
Page 10: ...10 Rosemount HMC C01 ...
Page 26: ...Installation Reference Manual April 2022 00809 200 4245 26 Rosemount HMC C01 ...
Page 30: ...Start Up Procedure Reference Manual April 2022 00809 200 4245 30 Rosemount HMC C01 ...
Page 32: ...Scheduled Maintenance Reference Manual April 2022 00809 200 4245 32 Rosemount HMC C01 ...
Page 38: ...Scheduled Maintenance Reference Manual April 2022 00809 200 4245 38 Rosemount HMC C01 ...
Page 41: ...Reference Manual Troubleshooting 00809 200 4245 April 2022 Reference Manual 41 ...