Emerson Rosemount 3095FC MultiVariable Quick Start Manual Download Page 1

Quick Start Guide

00825-0100-4832, Rev CA

June 2016

with Modbus

®

 Protocol

Rosemount

 3095FC MultiVariable

 

Mass Flow Transmitter 

4832 Rev CA.fm  Page 1  Wednesday, June 22, 2016  2:06 PM

Summary of Contents for Rosemount 3095FC MultiVariable

Page 1: ...Quick Start Guide 00825 0100 4832 Rev CA June 2016 with Modbus Protocol Rosemount 3095FC MultiVariable Mass Flow Transmitter ...

Page 2: ... and practices Before connecting communications in an explosive atmosphere make sure the instruments in the loop are installed in accordance with intrinsically safe or non incendive field wiring practices In an Explosion Proof Flame Proof installation do not remove the transmitter covers when power is applied to the unit Process leaks may cause harm or result in death To avoid process leaks only u...

Page 3: ... from service 3 Install the Rosemount 3095FC on a pipestand using clamps or mounting brackets 4 Connect the impulse lines 1 2 Installing the Rosemount 3095FC on an orifice plate direct mount The following steps must be taken to install the Rosemount 3095FC on an orifice plate 1 Remove the orifice meter run from service 2 Install the Rosemount 3095FC on the meter run using a manifold and hardware t...

Page 4: ...pically carbon steel or stainless steel Confirm the material by viewing the markings on the head of the bolt and referencing Table 1 If bolt material is not shown in Table 1 contact the local Emerson Process Management representative for more information Use the following bolt installation procedure 1 Carbon steel bolts do not require lubrication and the stainless steel bolts are coated with a lub...

Page 5: ...ury The two flange adapters are distinguished by unique O ring grooves Only use the O ring that is designed for its specific flange adapter as shown below A Flange adapter B O ring C PFTE D Elastomer Whenever the flanges or adapters are removed visually inspect the o rings Replace them if there are any signs of damage such as nicks or cuts If you replace the o rings re torque the flange bolts and ...

Page 6: ... signal errors Table 2 displays the RTD terminal connections for the various RTD probes 3 Wire the power supply The terminals are labeled CHG for positive power connection and CHG for negative power connection on a label on the termination board These connections provide the input voltage and power for the battery charging circuit The maximum voltage that can be applied to the CHG CHG terminals is...

Page 7: ...al communications port on the PC The other end of the cable plugs into the Rosemount 3095FC Figure 3 Operator Interface Wiring Table 3 Local Operator Interface Port Wiring Signal Label Common COM LOI Power 1 1 Do not use the LOI to power external devices TX V Common COM Ready to Send RTS Receive RX Transmit TX 1 6 7 8 9 2 3 4 5 To screw terminals Connection at PC COM port White TX Red TX Black TX ...

Page 8: ...ace the power jumper in the ON position The jumper is located on the LCD display if installed or at J1 on the Battery Charger Board 4 Screw the front end cap cover LCD display end After the Rosemount 3095FC completes start up diagnostics RAM and other internal checks the optional LCD display shows the date and time to indicate that the Rosemount 3095FC completed a valid reset sequence A LOI B RET ...

Page 9: ...e Gas Quality tab from the top of the screen and verify the correct gas composition for your process 9 Select the Advanced tab from the top of the screen Verify the correct values for FPV method units of measure and all geographical parameters Select OK to exit the screen 6 0 Trim the transmitter Note Transmitters are shipped from Emerson Process Management Emerson fully calibrated per request or ...

Page 10: ... window 4 Verify Reading to determine if a Zero Sift correction is required 5 If the reading is not zero select Set Zero Shift to adjust the Zero and select Done If the reading is zero select Done 6 Select Done to close the calibration window and cancel the freeze values to begin using live readings for the flow calculations 7 Once the zero trim is complete verify that the high side block valve is...

Page 11: ...mitters EN 61326 1 1997 A1 A2 and A3 Ordinary Location Certification for Factory Mutual As standard the Rosemount 3095FB Transmitter has been examined and tested to determine that the design meets basic electrical mechanical and fire protection requirements by FM a nationally recognized testing laboratory NRTL as accredited by the Federal Occupational Safety and Health Administration OSHA 7 3 Haza...

Page 12: ...June 2016 12 Quick Start Guide Figure 5 Rosemount 3095FC Declaration of Conformity ...

Page 13: ...Quick Start Guide 13 June 2016 ...

Page 14: ...June 2016 14 Quick Start Guide ...

Page 15: ...Quick Start Guide 15 June 2016 ...

Page 16: ...y X O O O O O ༣փ㓴Ԧ Housing Assembly X O O X O O Րᝏಘ㓴Ԧ Sensor Assembly X O O X O O ᵜ㺘Ṭ ᦞ SJ T11364Ⲵ㿴ᇊ㘼ࡦ This table is proposed in accordance with the provision of SJ T11364 O Ѫ䈕䜘ԦⲴᡰᴹ 䍘ᶀᯉѝ䈕ᴹᇣ 䍘Ⲵਜ਼䟿 վҾGB T 26572ᡰ㿴ᇊⲴ䲀䟿㾱 O Indicate that said hazardous substance in all of the homogeneous materials for this part is below the limit requirement of GB T 26572 X Ѫ 䈕䜘Ԧᡰ Ⲵᡰᴹ 䍘ᶀᯉ䟼ˈ㠣ቁᴹа 䍘ᶀᯉѝ䈕ᴹᇣ 䍘Ⲵਜ਼䟿儈ҾGB T 26572ᡰ㿴...

Page 17: ...Quick Start Guide 17 June 2016 ...

Page 18: ...es Terms of Use aspx The Emerson logo is a trademark and service mark of Emerson Electric Co MultiVariable Rosemount and Rosemount logotype are trademarks of Emerson Process Management Modbus is a registered trademark of Gould Inc All other marks are the property of their respective owners 2016 Emerson Process Management All rights reserved Europe Regional Office Emerson Process Management Europe ...