background image

5

Penberthy 

SErIES N6 GaGEcockS 

InstallatIon, operatIon and maIntenance InstructIons

6.1 Preventative maintenance

The user must create maintenance schedules, 
safety manuals and inspection details for each 
specific installation of a gagecock set.
For purposes of maintenance on all 
installations, the gagecocks should be 
evaluated regularly for signs of:
1.  Leakage around stem area.
2.  Internal stem leakage.
3.  Leakage around stuffing box connection.
4.  Internal or external corrosion.

The user must determine an appropriate 
maintenance schedule necessary for his or her 
specific application upon evaluation of their own 
operating experience. realistic maintenance 
schedules can only be determined with full 
knowledge of the services and application 
situations involved.

4.  Signs of internal or external corrosion could 

be an indication of a misapplication. an 
investigation should immediately be carried 
out to determine the cause of the problem. 
It is the user's responsibility to choose a 
material of construction compatible with 
both the contained fluid and the surrounding 
atmosphere in the specific application.

5.  For broken sight glass replacement, follow 

Disassembly steps 'a', 'b' and 'g' through 
'l' and reassembly steps 'a', 'b' and 'g' 
through 'm'.

safety InstruCtIOns

New glass packing must be used when replacing 
glass.

6.2 Maintenance procedures

1.  Stem packing leakage can often be stopped 

by tightening the stem packing nut. If 
leakage persists, the stem packing should 
be replaced by following steps 'a' through 
'f' of Disassembly and 'a' through 'f' of 
reassembly instructions.

2.  Signs of an internal stem leak is an 

indication of a worn or damaged stem or 
seat.

  a.   To replace the stem, follow disassembly 

steps a through 'f' and reassembly steps 
'a' through 'f'.

  b.   To renew the seat surface, follow 

Disassembly steps 'a' through 'f'. renew 
seat by using a fine lapping compound 
and a mandrel with the same size, 
shape and seat angle as the stem. Flush 
gagecock body clean and reassemble 
by following steps 'a' through 'f' of 
reassembly.

 

note: 

Series N6 gagecocks have an integral 

seat. The gagecock body must be replaced 
when the seat becomes worn or damaged 
beyond repair.

3.  Signs of leakage around the stuffing box 

indicate worn out glass packing or improper 
compression of glass packing. To replace 
glass packing, follow Disassembly steps 
'a', 'b' and 'g' through 'l' and reassembly 
steps 'a', 'b' and 'g' through 'm'. In the event 
of improper compression, leakage can be 
stopped by tightening the gage coupling nut.

7 reMOVal - dIsasseMbly - reasseMbly

WarnIng

Do not proceed with the disassembly of a gage 
unless the gagecock has been relieved of all 
pressure or vacuum, has been allowed to reach 
ambient temperature, and has been drained 
or purged of all fluids. Failure to follow any 
instructions could result in severe personal injury 
or property damage.

7.1 disassembly

a.  close upper and lower gagecocks.
b.  open draincock and allow gagecocks to 

drain.

c.  remove handwheel screw, nameplate and 

handwheel or lever from stem.

d.  Loosen and remove stem packing nut.
e.  remove stem by turning counterclockwise, 

along with stem packing and stem packing 
retainer.

f.  Slip the stem packing and stem packing 

retainer off the stem.

g.  remove guard rods if present.
h.  Loosen glass packing nuts on both upper 

and lower gagecocks.

i.  Slide sight glass upward into upper 

gagecock until bottom of tubular glass 
clears the stuffing box connection on the 
lower gagecock.

j.  While holding the tubular glass in this 

upward position, rotate upper gagecock 
counterclockwise (approx. ⅛ turn) to allow 
clearance to remove sight glass from upper 
gagecock.

k.  remove sight glass from upper gagecock.
l.  remove glass packing nuts, glass packing 

glands and glass packing from both the 
upper and lower gagecocks.

Summary of Contents for PENBERTHY N6 Series

Page 1: ...r products buildings personnel or property by reason of the installation or use of its products This is Emerson s sole warranty and in lieu of all other warranties expressed or implied which are hereby excluded including in particular all warranties of merchantability or fitness for a particular purpose This document and the warranty contained herein may not be modified and no other warranty expre...

Page 2: ...being gaged tends to surge in a rapid manner the ball checks could tend to give a false level reading or seat accidentally Series N6 gagecocks are not suitable for steam water applications unless they are furnished with one of the following optional features 1 Non automatic gagecocks ball checks removed from both upper and lower gagecocks 2 Automatic gagecocks vertical rising ball check and ball i...

Page 3: ...Under no circumstances should these design ratings or application data be exceeded Exceeding design ratings or application data may cause severe physical injury or property damage 3 2 User s rating inspection The user should confirm that 1 The gagecock set model number and pressure temperature rating stamped on nameplate 163 conforms to the description on the user s purchase order 2 The operating ...

Page 4: ...nstallation Guard rods two required are assembled downward through upper gagecock with swaged portion on rods at the top Bottoms of rods are positioned into respective holes in the lower gagecock 5 Operation 5 1 Pre operational check 1 Assure that all installation procedures have been completed 2 Check to determine that all connections are pressure tight 5 2 Hydrostatic test 1 Take all precautions...

Page 5: ...seat surface follow Disassembly steps a through f Renew seat by using a fine lapping compound and a mandrel with the same size shape and seat angle as the stem Flush gagecock body clean and reassemble by following steps a through f of Reassembly Note Series N6 gagecocks have an integral seat The gagecock body must be replaced when the seat becomes worn or damaged beyond repair 3 Signs of leakage a...

Page 6: ... appropriate federal and industry regulations the user must determine the extent of preparation and treatment the gagecock must incur before its disposal A Material Safety Data Sheet MSDS may be required before disposal services accept certain components Metal glass and polymers should be recycled whenever possible Refer to order and relevant technical data sheets for materials of construction 9 T...

Page 7: ...11 Body 15 Ball 17 Stem 18 Retainer stem packing 25 Packing stem 26 Nut stem packing 28 Handwheel 163 Nameplate 100 Screw Recommended spare parts Item Description Min qty 18 Retainer stem packing 2 25 Packing stem 2 26 Nut stem packing 1 34 Packing glass 2 35 Retainer glass packing 2 37 Nut glass packing 1 48 Glass 1 Recommended maximun quantities should provide spare parts for 10 of the gagecocks...

Reviews: