I N S T R U C T I O N M A N U A L R E V 4 . 2
19
CALIBRATION PAGE
Touch the Cal Icon on the home page. Initiate a Z/S
check by pressing the Green Manual Cal Initiate button
(It will turn Yellow). The zero is 3 minutes and span is 3
minutes long for calibration cycle of 6 minutes. The
Right column will show In Zero and at about 30 seconds will update the
Green Pass or the Red Fail icon. The values are entered at set up in the
tech screen under “Zero cal value, Span Cal Value". If these values are
/- 2% Opacity the green Pass will be shown, If it is not it will
show Red Fail and trigger the fault system. Fail will remain in memory
until after the values are corrected and another cal is initiated.
The current opacity and window dust is displayed below for your
convenience. The system will automatically return to monitoring the
process at the 6 minute point from cal start. You will know this because
the Manual Cal Initiate icon will return to Green. It is not necessary to
stay in this screen after initiation and recommended to return to the
screen normally displayed.
FAULT PAGE
Acknowledge Fault button: when in fault pressing the Ack button
will temporarily open the fault contact 14.
After time limit (set in tech screen 4: default 1 minute) if any
fault is showing the relay will close, energize. If all faults are
cleared the relay will auto reset to open, de-energize.