SECTION 2 INSTALLATION CONSIDERATIONS
BEFORE START UP
You must complete the following before start up is attempted.
Measure and record flange -to-flange distance to verify it is the same as final check out sheet.
If you are using a recorder, DAS, etc., DO NOT CONNECT THEM NOW. Outputs and inputs from other sources should be left off until
system has been completely checked according to the following instructions. After system operation has been verified connect and
test external connections.
Read the instructions first to familiarize yourself with the instrument before attempting start up.
The air purge and Weather cover system, Transceiver, Retro reflector, Service module must be installed and power applied.
Control unit must be installed and wired to the service module and customers equipment as applicable.
All wiring and mechanical installations must be complete per drawings provided in this manual. All wiring must be checked and
power applied to both the control unit and the stack maintenance module.
Beam Alignment procedure has been completed.
ENVIRONMENT
Locate the control unit in an easily accessible area with temperatures between +32o to 122o F. To permit the operator to read
and/or change controls, the unit should not be mounted higher than five feet from floor level.