20
Direct Connect Meters
Installation
Figure 3-7 Applying the heat shrink
g. Position gland clamping insert so the interior end is flush with the heat shrink.
h. Fold the cloth shield or braid and drain wires over the clamping insert and
approximately 1/8 inch (3 mm) past the O-ring.
Figure 3-8 Folding the cloth shield
i. Install the gland body into the core processor housing conduit opening.
Figure 3-9 Gland body and core processor housing
6. Insert the wires through the gland body and assemble the gland by tightening the
gland nut.
7. Connect signal wires to the RS-485 terminals on the core processor (see
you are using Micro Motion 4-wire cable, use the green and white wires.
Shielded heat shrink completely covers exposed drain wires
Summary of Contents for Micro Motion MVD Direct Connect
Page 1: ...Installation Manual 20002273 Rev AA July 2014 Micro Motion MVD Direct Connect Meters ...
Page 4: ...4 Direct Connect Meters ...
Page 6: ...6 Direct Connect Meters Before you begin ...
Page 26: ...26 Direct Connect Meters Installation ...
Page 29: ...Installation Manual 29 MVD Direct Connect communications ...