Installation Checklist and System Fill for Startup
29
7.0
I
NSTALLATION
C
HECKLIST
AND
S
YSTEM
F
ILL
FOR
S
TARTUP
7.1
Checklist for Proper Installation
___ 1. Liebert XDR modules are securely attached to the cabinet and aligned properly with the rack.
___ 2. Check to ensure there are no obstructions that prevent the Liebert XDR from opening.
___ 3. Piping from Liebert XDP or Liebert XDC, with isolation valves, is
properly
connected to each
Liebert XDR module.
___ 4. Liebert XD Flex Pipe couplings to prefabricated header assembly are secure and according to
specifications.
___ 5. System checked for leakage.
___ 6. Check the R-134a refrigerant charge (see the user manual for either the Liebert XDP,
SL-16671 or the Liebert XDC, SL-16644; each is available on the Liebert Web site,
www.liebert.com
).
___ 7. Run system and verify that the Liebert XDP or Liebert XDC and the Liebert XDR modules
operate properly.
___ 8. Piping is insulated.
7.2
Charging with Refrigerant
The Liebert XD system must be completely installed before it is charged with refrigerant. After
installation is complete, refer to the Liebert XDP or Liebert XDC user manual for instructions on
charging Liebert XD modules with refrigerant and the starting of the system. The complete Liebert
XD system includes all Liebert XD cooling modules, a Liebert XDC or Liebert XDP and any other con-
nected equipment.