Table 9-3: Planned maintenance tasks
(continued)
Task
Recommended action
Part (seal) replacement
Visual inspection of the O-rings is recommended once a year
and replacement of the O-rings is recommended at least
once every five years. Follow internal procedures for part
replacement. Do not twist or overstretch the O-ring during
assembly.
Corrosion monitoring
Daniel recommends visually inspecting the control valve for
corrosion in the internal components at least once a year.
Follow internal procedures for corrosion. The valve was
designed without corrosion allowance. Periodically inspect
the valve's metal parts for corrosion and erosion, and inspect
the seals and O-rings for wear and chemical damage.
Lubricant information
High-viscosity silicone oil with a temperature range of -54° C
to 204° C (-65° F to 400° F).
Proper lubrication procedure
Lubricate the entire surface of the O-ring before installation
with a thin layer of high-viscosity silicone oil. Remove excess
lubricant.
User manual
Planned maintenance
P/N 3-9008-556
October 2019
User manual
81
Summary of Contents for Daniel 788DVC
Page 2: ...2 ...
Page 48: ...Introduction User manual October 2019 P N 3 9008 556 48 Model 788DVC Digital Control Valve ...
Page 88: ...Spare parts User manual October 2019 P N 3 9008 556 88 Model 788DVC Digital Control Valve ...
Page 90: ...Decommission User manual October 2019 P N 3 9008 556 90 Model 788DVC Digital Control Valve ...