TI_Unit_CO2_Stream_04_EN_Rev00
Ident number 3293976 (P/N 900-0010-00/Rev00)
3/3
▪
Mount the deflector and tighten it manually to 1-5 Nm
(Figures 11 & 12)
.
▪
The changeover valve must be fully open during unit operation (spindle out
Figures 13 & 15
).
▪
Mount the spindle cap and check the presence of the copper gasket
(Figure 14)
.
Figure 11 Figure 12
Figure 13
Figure 14
Figure 15
Spindle protective cap
Spindle "open" / "closed"
Seal gland
40 Nm
25 Nm
15 Nm
Table 2
: Torques on the changeover valve in Nm
NOTE: For information on the maintenance and lifetime of the PRV, please refer to the unit application
guidelines.
- The contents of this publication are presented for informational purposes only and are not to be construed as warranties or guarantees, express or implied, regarding
the products or services described herein or their use or applicability.
- Emerson Climate Technologies GmbH and/or its affiliates (collectively "Emerson"), as applicable, reserve the right to modify the design or specifications of such
products at any time without notice.
- Emerson does not assume responsibility for the selection, use or maintenance of any product. Responsibility for proper selection, use and maintenance of any
Emerson product remains solely with the purchaser or end user.
- Emerson does not assume responsibility for possible typographic errors contained in this publication.