  Apply teflon sealing tape (0.1x12 mm) to the changeover valve by 5 to 6 turns clockwise (

Figure 4

). 

  Mount the changeover valve onto the liquid receiver; torque to 50 Nm (

Figure 5

). 

  Apply teflon sealing tape (0.1x12 mm) 

to both NPT PRV‘s by 5 to 6 turns clockwise (

Figure 6

). 

  

  

 

Figure 4   

 

 

Figure 5   

 

 

 

 

          Figure 6 

 

  Mount both PRV

‘s into the changeover valve; torque to 40 Nm 

(Figure 7)

  Turn the spindle into middle position so that both PRV ports are open 

(Figure 8)

  Close the shut-off valves on the compressor (discharge port) and on the liquid receiver 

(Figure 9)

  Open  the  high-pressure  valve  and  perform  a  bubble  leak  test  on  all  connections  between  liquid  receiver, 

changeover valve and PRV’s 

(Figure 10)

  Pressurize the liquid receiver with nitrogen (5 bar) and perform a preliminary leak test. 

  Perform the final leak test at 80 bar. 

  

  

 