TI_Unit_CO2_Stream_04_EN_Rev00
Ident number 3293976 (P/N 900-0010-00/Rev00)
2/3
▪
Apply teflon sealing tape (0.1x12 mm) to the changeover valve by 5 to 6 turns clockwise (
Figure 4
).
▪
Mount the changeover valve onto the liquid receiver; torque to 50 Nm (
Figure 5
).
▪
Apply teflon sealing tape (0.1x12 mm)
to both NPT PRV‘s by 5 to 6 turns clockwise (
Figure 6
).
Figure 4
Figure 5
Figure 6
▪
Mount both PRV
‘s into the changeover valve; torque to 40 Nm
(Figure 7)
.
▪
Turn the spindle into middle position so that both PRV ports are open
(Figure 8)
.
▪
Close the shut-off valves on the compressor (discharge port) and on the liquid receiver
(Figure 9)
.
▪
Open the high-pressure valve and perform a bubble leak test on all connections between liquid receiver,
changeover valve and PRV’s
(Figure 10)
.
▪
Pressurize the liquid receiver with nitrogen (5 bar) and perform a preliminary leak test.
▪
Perform the final leak test at 80 bar.
Figure 7
Figure 8
Figure 9
Figure 10