Introduction
ATCA-F140 Installation and Use (6806800M67H
)
18
Stratum 3 Telco clock option with master/slave sync and 5 inter-shelf sync connectors on
front panel along with 2 BITS/SSU front panel connectors
One AMC bay for application processor support
IPMC functionality for the board management by the Shelf Management Controller
1.2
Standard Compliances
This blade, when installed in a compliant shelf, meets the following standards.:
Table 1-1 Standard Compliances
Standard
Description
UL/CSA No. 60950-1
EN 60950-1
IEC 60950-1 CB Scheme
UL/CSA No. 60950-1
Legal safety requirements
ANSI T1.319-2002
NEBS GR-63-CORE
ANSI Fire Spread Criteria
AT&T Document ATT-TP-76200
Network Equipment Power, Grounding, Environmental,
and Physical Design Requirements
ETSI Acoustic Noise ETS 300 753
Class 3.1
ETSI acoustic noise requirements
ETSI Stationary Use: EN 300 019-2-3
Class 3.1
ETSI stationary use requirements (temperature-con-
trolled locations
ETSI Storage EN 300 019-2-1 Class
1.2
ETSI storage requirements in system level (not
temperature- controlled storage locations)
ETSI Transportation: EN 300 019-2-2
Class 2.3
ETSI public transportation requirement on system level
Telcordia GR-1089-CORE
Electromagnetic Compatibility and Electrical Safety -
Generic Criteria for Network Telecommunications Equip-
ment
Telcordia GR-63-CORE
NEBS Requirements: Physical Protection
Telcordia SR-3580
NEBSCriteria Level 3
StockCheck.com