This document describes installation and replacement procedures for 

the SVR-D2U-R710 server. Topics include:

Technical information and requirements .......................................... 2

Installing the server in a rack or cabinet ........................................... 4

Replacing the server drives............................................................... 11

Replacing a server power supply..................................................... 14

Replacing the server chassis ............................................................. 17

Removing mounting rails from the cabinet.................................... 24

Adjusting universal rail length......................................................... 26

Note: 

Replacement of server components, including disk drives, power 

supplies, or chassis, by unauthorized personnel may void service warranties. 
Review your Service Contract for clarification before attempting to perform 
hardware service procedures. 

SVR-D2U-R710

Installation and Replacement Guide

P/N 300-009-318

Rev A03

September 28, 2010

Summary of Contents for SVR-D2U-R710

Page 1: ...pply 14 Replacing the server chassis 17 Removing mounting rails from the cabinet 24 Adjusting universal rail length 26 Note Replacement of server components including disk drives power supplies or cha...

Page 2: ...ling and weight information For additional information refer to the preparation planning guides for your specific site and cabinet Requirement Description AC line voltage 90 264 V AC autoranging 47 63...

Page 3: ...d storage requirements Requirement Description Ambient temperature 10oC to 35oC 50oF to 95oF Temperature gradient 10oC hr 18oF hr Relative humidity extremes 20 to 80 noncondensing Recommended operatin...

Page 4: ...rails in the cabinet on page 6 Installing the server in the cabinet on page 7 Installing bezels on page 10 Mounting kit parts The server mounting kit includes rails hardware and bezel as listed in th...

Page 5: ...white disconnect tab forward to release the inner rail from rest of the assembly and then remove the rail Figure 1 Removing inner rails from the rail assembly Attaching the inner rails Figure 2 shows...

Page 6: ...to install the rear bracket first as described in step 2 below 1 Pull the middle rail out and into the locked position Use the exposed middle rail for leverage as you attach the assembly 2 From the fr...

Page 7: ...ft and or help from another person Before mounting the server to the rails be sure the ball bearing retainer sheath is locked forward and the secondary security plungers are in the default down and lo...

Page 8: ...Guide Installing the server in a rack or cabinet Figure 5 Inserting the server in the cabinet 3 Slide the blue release tab and then push the server into the cabinet An audible click indicates that th...

Page 9: ...tallation and Replacement Guide Figure 6 Securing the server in the cabinet 4 To further secure the rail assembly in the cabinet insert and tighten a stabilizer screw directly behind each bezel latch...

Page 10: ...ver in a rack or cabinet Installing bezels Figure 8 shows how to install a typical front bezel 1 Press the bezel onto the latch brackets until it snaps into place 2 Lock the bezel with the provided ke...

Page 11: ...swappable hard drive carriers that fit in the hard drive bays CAUTION To maintain proper system cooling all hard drive bays must have drives or blanks installed This section describes replacing a fail...

Page 12: ...press toward the center to release the bezel from its latches Figure 9 Removing a front bezel Each drive sled has LED indicators that show the current status of the drive A failed drive will have an a...

Page 13: ...ge the partially installed carrier s shield spring and make it unusable 2 Install the hard drive as shown in Figure 10 a Press the button on the front of the drive carrier and open the handle b Insert...

Page 14: ...ower supply consists of the following steps Identifying the failed power supply Removing and replacing the power supply Note The power supplies are hot swappable and can be replaced during normal syst...

Page 15: ...h redundant power supplies verify that both power supplies are the same type and have the same maximum output power Note The maximum output power shown in watts is listed on the power supply label 2 S...

Page 16: ...ote When installing a new power supply allow several seconds for the system to recognize the power supply and determine its status The power supply status indicator turns green to signify that the pow...

Page 17: ...idual FRUs Motherboard Mid plane assembly DVD ROM Server HBA If any of these components fail you must replace the entire server The replacement procedure is divided into the following sections Powerin...

Page 18: ...the back of the server Label the cables so they can be easily identified when they are connected to the replacement server 2 Remove the bezel as shown in Figure 12 Figure 12 Removing a front bezel No...

Page 19: ...brackets on each side Figure 13 Figure 13 Removing the stabilizer screws 4 Pull the inner rail release buttons then pull the server forward until it extends into the locked position Figure 14 Figure 1...

Page 20: ...abs forward to release the inner rails from the slides then slowly pull the server forward Figure 16 CAUTION The enclosure is heavy and should be removed from a rack by two people To avoid personal in...

Page 21: ...server chassis SVR D2U R710 Installation and Replacement Guide Figure 16 Releasing the inner rail lock 7 Carefully remove the server from the cabinet Figure 17 Figure 17 Removing a server from a cabi...

Page 22: ...de rails to the replacement server Install the new server in the cabinet Removing inner rails from the original server To remove an inner rail from the original server pull up the stand off spring and...

Page 23: ...nstallation and Replacement Guide Installing the new server in the cabinet Install the new server in the cabinet Refer to Installing the server in the cabinet on page 7 Installing the bezel Install th...

Page 24: ...Remove the server chassis from the cabinet as described in Removing the server from the cabinet on page 18 2 Push the metal lever on the middle rail as you push the rail back into the cabinet Figure 1...

Page 25: ...25 Removing mounting rails from the cabinet SVR D2U R710 Installation and Replacement Guide Figure 20 Releasing the slide rail kit from the cabinet channels CL4357...

Page 26: ...r type A universal rail kits supports cabinets in which the front and rear mounting channels are 24 to 29 inches apart Alternative settings for type A kits support cabinets 18 24 inches and 29 34 inch...

Page 27: ...to 25 inches apart Alternative settings for type B kits support cabinets 18 21 inches 25 28 inches 28 32 inches and 32 35 inches deep To change the rail length move the screw nut assemblies on each o...

Page 28: ...NY KIND WITH RESPECT TO THE INFORMATION IN THIS PUBLICATION AND SPECIFICALLY DISCLAIMS IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Use copying and distribution of any EMC...