background image

 

EMC

®

 Celerra

®

 NS-480 System

 

(Dual Blade)

Installation Guide

P/N 300-010-732 Rev A01

Version 6.0

Summary of Contents for Celerra NS-480 System

Page 1: ...EMC Celerra NS 480 System Dual Blade Installation Guide P N 300 010 732 Rev A01 Version 6 0...

Page 2: ...NTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Use copy or distribution of any EMC software described in this publication requires an applicable software license For the most up to date...

Page 3: ...age array software FLARE Software upgrade If you bought a software maintenance contract you are entitled to software upgrades only after the installation Celerra Startup Assistant CSA and registration...

Page 4: ...sly lim ite d to the term s an d co nd itio ns of the Lic en se Ag reem en t EMC Celerra NS20 Back Next Cancel EMC Celerra NS20 System Tutorial CSA Installation P N nnn nnn nnn A0n EMC Tutoria l CSA...

Page 5: ...e seated securely About 45 minutes 3 When you install your Celerra NS 480 use the Celerra Startup Assistant CSA to pre configure your system The latest version of the CSA can be downloaded from the Ce...

Page 6: ...net 70 in in height 1 unit 1 75 in start on page 15 of this document and confirm that the cables are installed correctly and securely otherwise start unpacking your Celerra NS 480 system from the disp...

Page 7: ...ure SPE Ganged rails Remove this label and paste it on the back of the front cover of this installation guide Ganged rails Contents of package Disposable mini rack Accessory box Document inventory lis...

Page 8: ...hipping container For more information refer to Celerra Tools on http Powerlink EMC com 2 Carefully set aside each component as it is removed from the disposable mini rack shipping container Caution T...

Page 9: ...rails in your rack Remove the reusable rails from the disposable mini rack Disposable mini rack Remove ganged rails from mini rack CNS 001383MOD Remove 3 screws each side Remove ganged rails from min...

Page 10: ...retention screws in the back of each rail See the following illustration 3 Do not fully tighten the retention screws at this time Allow some adjustment space for the installation of the components In...

Page 11: ...screw per side Control Station CS Standby sower supply SPS Storage processor SP Front Press The indentation goes toward the inside of the rack Install the lower screw first with 2 screws on each side...

Page 12: ...n with additional Fibre Channel module NS 480 configuration with additional iSCSI modules MGMT B B0 B1 B2 B3 B4 MGMT A A0 A1 A2 A3 A4 CNS 001371MOD 10 100 1000 10 100 1000 1 2 3 1 2 3 MGMT B B0 B1 B2...

Page 13: ...10 100 046 003 710_A01 FRU label 10 100 Blade 3 fge 0 fge 1 Blade 2 fge 0 fge 1 Blade enclosure CNS 001369 046 003 710_A01 FRU label 10 100 046 003 710_A01 FRU label 10 100 Blade 3 Blade 2 fxg 0 fxg...

Page 14: ...BE 0 BE 1 10 100 Blade 3 Blade 2 046 002 842_A01 BE 0 BE 1 10 100 046 002 842_A01 BE 0 BE 1 10 100 MGMT B B0 B1 B2 B3 B4 MGMT A A0 A1 A2 A3 A4 1 2 3 10 100 1000 0 10 100 1000 0 0 1 2 3 0 1 0 1 2 3 1...

Page 15: ...1373 SP B Blade enclosure SP A BE0 BE1 BE0 BE1 2 Fibre 2 Storage processor enclosure 1 2 3 0 3 4 SP A A0 Port 2 BE 0 Blade 2 SP A A0 Port 3 Blade 3 BE 0 SP B B0 Port 2 BE 1 Blade 2 1 2 3 0 SP B B0 Por...

Page 16: ...y SPS B Modem Control Station Storage processor enclosure SPS A 1 2 3 0 SP B SP A CNS 001385 SPS A Blade enclosure 1 2 3 0 1 2 3 0 1 2 3 0 SPS B SPS A SPB MGMT B SPA MGMT A CS 3 2 1 A B Cable the NS 4...

Page 17: ...B l a d e 2 3 SPB MGMT B Blade 3 4 SPA MGMT A SPB MGMT B A A B Blade 2 SPA MGMT A CS B B l a d e 3 CS CS CNS 001378 A B For more information refer to Celerra Tools on http Powerlink EMC com Cable the...

Page 18: ...dby power supply To public LAN 3 To public LAN customer supplied To public LAN customer supplied To public LAN MGMT 3 1 2 cge0 cge3 cge1 cge2 cge0 cge3 cge1 cge2 MGMT A B Note Attach the customer prov...

Page 19: ...connector Latch side down LCC A A B LCC B PRI 1 2 Pull release tab Pull release tab CNS 001368 0 Blade enclosure 1 2 3 0 LCC B LCC A Disk array enclosure DAE Storage processor enclosure SPE Pull rele...

Page 20: ...B are in the OFF position Connect the power cables as follows A yellow circle with a number indicates the power cable number 1 Connect power supply A on the first disk array enclosure DAE to standby...

Page 21: ...A B Blade 2 CNS 001380 Blade 3 Disk array enclosure DAE 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 PDP SPS B switch SPS A switch 1 7 8 5 6 3 4 2 9 Note The blades in your Celerra system may have four Ethernet co...

Page 22: ...A0 MGMT B0 1 2 3 0 SP B 1 2 3 0 1 2 3 0 1 2 3 0 Blue when cabled Blue when cabled Storage processor SP A Disk array enclosure A B LCC B LCC LCC A Blinks green when booting Blinks green when booting S...

Page 23: ...ents through a switch To connect directly to MPFS clients connect each client to the corresponding Fibre Chan nel ports on the I O modules For example a client connected to port 0 in slot B2 should al...

Page 24: ...not use MPFS proceed to page 26 To connect to MPFS clients through a switch connect the clients to the switch and connect the Fibre Channel ports on the I O modules to the switch 0 0 10 100 1000 MGMT...

Page 25: ...ct the clients to the switch and connect the iSCSI ports on the I O modules in slots A2 A3 A4 B2 B3 and B4 For more information refer to Celerra Tools on http Powerlink EMC com MGMT B B0 B1 B2 B3 B4 M...

Page 26: ...L STATION MGMT A CS B SP B SP A SPS B SPS A CS A B 1 2 3 0 MGMT A0 MGMT B0 LCC B DAE MGMT LCCA PRI CS A CS B LCC A LCC B PRI Blade 3 Blade 2 BE 0 Blade 2 BE 1 Blade 3 BE 0 Blade 3 BE 1 Blade 2 0 1 0 1...

Page 27: ...S A CS A B 1 2 3 0 MGMT A0 MGMT B0 LCC B DAE MGMT LCCA PRI CS A CS B LCC A LCC B PRI fge 1 fge 0 fge 1 fge 0 SP B B0 Port 3 Blade 3 Blade 2 BE 0 Blade 2 BE 1 Blade 3 BE 0 Blade 3 BE 1 Blade 2 SP A A0...

Page 28: ...100 0 1 fge 1 fge 0 fge 1 fge 0 SPB B0 Port3 Blade 3 Blade 2 BE 0 Blade 2 BE 1 Blade 3 BE 0 Blade 3 BE 1 Blade 2 SPA A0 Port3 SPA A0 Port0 SPA A0 Port2 SPB B0 Port0 SPB B0 Port2 SPS A SPS B SP B MGMT...

Page 29: ...latest version of the CSA from the Celerra Tools section of Powerlink Getting Started with the Celerra Startup Assistant can be downloaded from Powerlink and provides more information on the CSA pre...

Page 30: ...outine array maintenance and upgrades In addition for Celerra systems where Navisphere licenses are in place Navisphere can be used to manage storage for external host connectivity and the Celerra How...

Page 31: ...section Storage provisioning involves creating RAID groups and LUNs Blade name IP Address to be assigned to the newly created interface Netmask address MTU optional default is 1500 VLAN ID optional d...

Page 32: ...name iSCSI target IP address iSCSI target name Allocate storage from select from dropdown iSCSI LUN number iSCSI LUN size MB GB or TB Number of expected Snaps Number of expected Promotes If you want t...

Page 33: ...er IPs Windows 2000 and Windows 2003 Domain admin user name Windows 2000 and Windows 2003 Domain admin password Windows 2000 and Windows 2003 Organizational unit Windows 2000 and Windows 2003 Workgrou...

Page 34: ...t 1 SP A port 2 SP A port 3 SP A port 4 SP A port 5 SP A port 6 SP A port 7 SP B port 0 SP B port 1 SP B port 2 SP B port 3 SP B port 4 SP B port 5 SP B port 6 SP B port 7 Note The number of iSCSI por...

Page 35: ...CSA Before installing the CSA verify the following requirements Access to the Powerlink website preferred or the Celerra Network Server Applications and Tools CD is available Windows based client comp...

Page 36: ...n Common implementations include Create CIFS shares Create iSCSI LUNs Create NFS exports Set up MPFS Add additional hosts for Fibre Channel enabled systems Perform Common Post CSA tasks Go to the Cele...

Page 37: ......

Page 38: ......

Reviews: