
E-ESD3000-E-Manual.doc
35/66
7 Maintenance and Servicing
7.1 Maintenance
No maintenance is necessary on the ESD3000.
7.2 Verification of the ESD3000 by the user
A full verification in accordance with the IEC standards can only be carried out with very expensive
measuring equipment. A simple verification is watching the spark at the finger or sharp tip to ground.
Ground cable must be connected. See warning advice on the ESD3000.
„ Make sure, the grounding cable is connected before you start using the ESD3000 high voltage“
7.3 Verification of the ESD3000 by EMC PARTNER AG
EMC PARTNER verify the ESD3000 in accordance with the verification chapter in the different standards.
ESD3000DM1
IEC 61000-4-2
ESD3000DM2 and DM3
ISO 10605
ESD3000DM4
MIL-STD-883
ESD3000DM5
RTCA/DO-160
ESD3000DM6 and DM7
IEC 61340-3-1 and IEC 61340-3-2
The ESD3000 and the discharge modules ESD3000DMx and ESD3000RM and networks have separate
test reports.
EMC PARTNER recommend a full verification of the ESD3000 once a year. A test report with all
oscillograms is included in the verification price. A full verification without a repair takes approximately 3
days.
Before a ESD3000 is delivered, all verifications are carried out in accordance with the basic documents.
All data are within the tolerable tolerances.
See verification report ESD3000 and DM or DN at the end of the Manual binder.
Summary of Contents for ESD3000
Page 24: ...ESD3000 System 24 66...
Page 40: ...ESD3000 System 40 66 replace the batteries by pull it out piece by piece...
Page 42: ...ESD3000 System 42 66...
Page 44: ...ESD3000 System 44 66...
Page 50: ...ESD3000 System 50 66...
Page 54: ...ESD3000 System 54 66...
Page 60: ...ESD3000 System 60 66...
Page 62: ...ESD3000 System 62 66...
Page 64: ...ESD3000 System 64 66...
Page 66: ...ESD3000 System 66 66...