background image

P4    

3.2 Electric install

 

3.2.1

 

Electricity connection

The control power input is AC 220-240V,50/60Hz.Electricity wires should be place away from 
probes  to  prevent  interference.It  is  not  recommended  that  the  controller  use  a  common 
power  input  source  with  other  electric  equipment  which  may  generate  surge  voltage  which 
can  cause  interference.  A  correct  grounding  connection  which  can  prevent  interference 
between equipment as well. It is highly recommended that the controller and diffuser pump 
are  connected  to  the  same  on/off  control  so  to  prevent  dosing  during  diffuser  pump  is  not 
under operating condition. 

Caution

Wires  must  be  connected  to  GFCI  or  RCD  and  the  wiring  should  comply  with 

regulatory requirement for the region.

3.2.2

 

Probe install

During connect the controller with powers (SANITOZER, POWER, PH DOWN and PH UP), you 
must  make  sure  the  power  is  disconnected.  Probe  wire  should  be  as  short  as  possible  and 
positioned far away from the power wire, pump, transformer or any other device which may 
cause  interference.  Probe  (ORP  and  pH)  must  be  connected  to  the  corresponding  BNC 
connector.  Incorrect  connection  may  cause  probe  or  controller  damage.  pH  and  ORP  probe 
which provide by Emaux   should be paired to use with the controller. Probes should be used 
pair  with  Emaux  probe  holder.  Probe  holder  can  be  install  in;  1)  main  pipe  (main  line),  or  2) 
sampling pipe (bypass line) (recommended method). Fix the probe holder on the pipe, place 
the  probe  into  the  holder  sealing  cap.  Tighten  the  cap  by  hand  only  to  avoid  breaking  the 
probe. Do not use a wrench.

Wiring box is on the lower side of the controller:

 

L: Live; N: Neutral; G: Ground 

(Wiring box internal)

 

 

No.1 (SANITIZER) : connect to SANITIZER dosing pump

No.2 (POWER)

: connect to power (220 – 240V AC)

No.3 (PH DOWN) : connect to Acid dosing pump

No.4 (PH UP)

: connect to Alk dosing pump

Summary of Contents for WT500PR

Page 1: ...USER MANUAL Model WT500PR DUAL PARAMETER WATER QUALITY MONITOR EMPU22071340...

Page 2: ...2 1 Electricity connection 3 2 2 Probe install PH AND ORP SETTING 4 1 Functional setting 4 1 1 Power up 4 2 Select ORP pH operating mode 4 3 Operating mode 4 3 1 Power up 4 3 2 Automatic mode CALIBRAT...

Page 3: ...re met the controller must be used with the accessories specified in this manual because those accessories has been tested their compatibility with the controller If damaged or malfunctioning is found...

Page 4: ...pH down Alk pH up Type of dosing pump AC 220V 240V 50 60Hz 50W max Display Segment digit display Size 214mm H X 185mm W X75mm D Install type Wall mounted Weight 1 1KG without probes Casing Material A...

Page 5: ...WER PH DOWN and PH UP you must make sure the power is disconnected Probe wire should be as short as possible and positioned far away from the power wire pump transformer or any other device which may...

Page 6: ...water in pipe does not freeze especially during Winter it will damage the probe To have an accurate measure result flow rate inside the pipe with probe must be in 2 10L 4 PH AND ORP SETTING Panel SET...

Page 7: ...e setting 4 3 2 1 2 Setup high pH setpoint Press SET HIGH digit display shows Press ORP or pH digital display shows pH high setpoint Press adjust the expected pH high setpoint Press SET HIGH to save t...

Page 8: ...up ORP Low ORP setpoint SANITIZER feed relay is open SANITIZER dosing pump stop At the same time ORP FEED LED turns off ORP Alarm ORP Low ORP ALARM setpoint or ORP High ORP ALARM setpoint ORP ALARM L...

Page 9: ...ng pH manual mode suggest the controller is connected to either Acid or Alk dosing pump only Otherwise both pump will running at the same time 5 CALIBRATION 5 1 Zero point calibration ORP pH zero poin...

Page 10: ...libration is done and return Without any key press for more than 8 seconds system will return automatically without save the setting Note The PH value standard liquid should be chosen the pH value whi...

Page 11: ...obe calibration pH1 0 pH10 0 7 RESET TO DEFAULT FACTORY SETTING Power the controller off press and hold keys SET HIGH and ALARM HIGH And then press power the controller up The control will have a beep...

Page 12: ...reading Check probe connections Run zero and probe calibration Replace probes Relay out of function dosing pump does not run Check dosing pump connection and power of controller Check the power and vo...

Page 13: ...YOUR PREMIER SUPPLIER www emauxgroup com EMAUX WATER TECHNOLOGY CO LTD...

Reviews: