23
© 2022, Elon Group AB. All rights reserved.
DESCRIPTION
1 Lid
2 Lid release
3 Body
4 Handle
5 Base
6 ON/OFF Switch
7 Base unit
GUIDE TO OPERATION
Before using for the first time
Prior to initial use, clean the appliance by
running several boiling cycles. Use fresh
water for each cycle, filling the kettle (3) to its
upper marking. The water will reach boiling
point after approximately 5 minutes and will
switch off automatically.
Operation
Place the base unit (7) on a firm and level
surface.
Pour the desired amount of clean water into
the kettle (3).
Do not touch any part of the
kettle except the handle.
When the appliance is in use ensure that
the lid (1) is properly closed. Measure the
amount of water using the level markings
on the outside of the kettle. Pay attention to
the minimum and maximum levels and en-
sure that the lid (1) is properly and securely
closed.
Position the kettle in such a way that the
underside of the base (5) fits precisely into
the contact on the base unit.
Insert the plug into a wall socket.
Move the on/off switch (6) to the "1" position
to start the boiling process. The indicator
lamp lights.