10
11
© 2021, Elon Group AB. All rights reserved.
INSTALLATION
Unpacking
_________________________________________________________________
Handle the drying cabinet with care when it is standing on the pallet unsupported.
RISK OF TIPPING!
_________________________________________________________________
Check that the goods have not been damaged in transport. Any transport damage must be reported to the
retailer within 7 days.
_________________________________________________________________
After unpacking the product, check that it is free from damage. Any damage, faults or missing parts must be
reported to the retailer immediately.
_________________________________________________________________
Check that all transport safety devices have been removed before connecting the drying
cabinet.
_________________________________________________________________
Keep packaging materials such as plastics and polystyrene foam away from children.
_________________________________________________________________
The drying cabinet must be installed and kept indoors.
_________________________________________________________________
Full delivery should include:
• Cabinet with dehumidifier
• Installation kit for securing cabinet
• Installation instructions and user manual
Installation kit
Screw TRX 5x70
zinc-plated for 2
securing to wall
2
Screw MRT 5 x 20
for bracket
4
Wall plug
2
Bracket for
securing to wall
2
Plastic hose 10 x 13,
1,5 m
Elbow for water hose
1
Hand brush for filter
1
Wall instructions
1