Analysis
20
2
CO2 outlet
3
Glass distributor
4
Connection to the furnace
5
Acid supply
6
50 ml glass flask
7
Heater with magnetic stirrer
8
Elevator with variable height
9
Acid
10
Furnace
11
Analyzer
12
Moisture trap
13
TIC/TC toggle
3.2.3 TIC-module installation
1.
The TIC module is placed next to the analyzer.
2.
Connect the mains power plug to a power socket.
3.
Connect the TIC module and the analyzer with the provided tubes. The
connectors are located at the backside of the analyzer and of the TIC-
module.
4.
The outlet of the furnace is connected via the H
2
O trap to the connection (
2
)
and finally to the inlet (
1
) of the TIC module.
5.
Inside the TIC module, this tube is connected to the input of the glass
distributor (
3
) (connection on top tube 4).
6.
The bottle of acid with dispenser (
9
) is placed to the right of the platform (
8
)
and it is connected to the connection (
5
) of the glass distributor.
7.
The glass distributor (
3
) with the glass flask (
6
) is adjusted properly when the
whole surface of the bottom of the glass flask (
6
) touches the surface of the
heater (
7
).
8.
The heater (
7
) is switched on and the temperature is set to 75°C.
9.
The stirrer is set to 400.
Summary of Contents for CS-580A
Page 3: ...3 ...
Page 38: ...Function description 38 Fig 14 Gas flow ...
Page 57: ......
Page 58: ......
Page 59: ......