Installation
18
1
Analyzer
2
Resistance furnace
3
Computer
4
Monitor
5
Printer
6
Balance
7
Quad power socket
8
Analyzer mains plug
9
Furnace mains plug
First connect the analyzer to the mains power and switch it on to position 1 in order to win time.
The power switch is located on the front panel in the low left hand corner. Set to position 1. The
reason why to first switch on the analyzer is for the infrared detectors to have time to stabilize
their temperature while cable connections and software start are made.
NOTICE
Never plug the furnace plug (9) into the triple socket on the rear panel of the analyzer.
4.4 Data Interface
Fig. 6: Data interfaces
1
Spare serial interface
2
PC connection (serial interface (COM-port))
3
Analog input/output signals
4
Digital input/output signals
5
Autoloader connection
When all devices are connected to the mains power, then data connections can be made. The
plugs are all different to each other, so that they cannot be interchanged. The required data
1
2
3
4
5
Summary of Contents for CS-2000
Page 2: ...2 Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...
Page 5: ...5 ...
Page 63: ...Maintenance 63 Fig 35 Induction furnace Cone ...
Page 80: ...Function description 80 Fig 51 Gas flow system ...
Page 91: ...Miscellaneous 91 8 1 6 Furnace Fig 60 Furnace 71031 71010 ...
Page 110: ...Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...