
18
BA-en-2015-1910_R55
4. Operation
4.1 Startup
Once all the connections have been made correctly, the system is opera-
tional and the supply voltage can be switched on at the power supply. The
ion blower head and the ion blower pistol are also operational now.
4.2 Operating voltage
The blower head and the blower pistol are supplied via the high voltage
supply unit. The appliances are operated with an optimum operating volt-
age of 5 resp. 6 kV.
4.3 Function control
Use the Eltex Volt Stick or a glow-lamp voltage tester to check the proper
function of the emission tips. Quote Article No. 109136 when ordering the
Volt Stick from Eltex.
Caution!
To avoid severe damage, keep other objects from hitting against the ion
blower head!