Elster GmbH
___________________________________________________________________________________________________________
EnCal 3000 - Hardware Manual
22/02/2018
39
/56
5.1.4
Connection of utilities
Gas lines:
Carrier 1: HE
Helium
5-6 barg (71-86 PSIg)
Recommended pressure 5.5 barg
Carrier 2: AR Argon 5-6 barg (71-86 PSIg) Recommended pressure 5.5 barg
(Second carrier gas only needed to analyse biogas or hy-
drogen in natural gas. In standard applications this con-
nection is not used and closed without piping inside.)
STR1
Stream 1
1-4 barg (15-57 PSIg)
STR2
Stream 2
1-4 barg (15-57 PSIg)
STR3
Stream 3
1-4 barg (15-57 PSIg)
STR4
Stream 4
1-4 barg (15-57 PSIg)
STR5
Stream 5
1-4 barg (15-57 PSIg)
CAL
Calibration Gas
1-4 barg (15-57 PSIg)
PV
Purge Vent
SBV
Block and Bleed Vent
All gas and vent lines do have a 1/8” Swagelok connection to the EnCal 3000. On request also 3 mm connections are
available.
fig. 5-4 Connections to the EnCal 3000
Power Supply cable
24 VDC / 120 W max
Conductor cross section: AWG 12-13 (2.5 - 4 mm²)
Armoured cable required for outdoor installation – OD between 12 and 25 mm
Data Communication
Ethernet
: shielded twisted 4 wire cable or industrial CAT5
ModBus Serial
: shielded twisted pair
All input, output signals and power connections shall be of non-hazardous voltage
and reinforced isolated from main.