Installation and commissioning
Leakage sensor Leak
• Version: 03.08.2017 • Errors and technical modifications subject to change without notice.
2.4. Leakage sensor commissioning
1. Connect the probe to the evaluation unit (insert the BNC plug).
2. Connect the mains supply line to the evaluation unit. Line voltage 230 V AC, 50 Hz.
3. The device is ready for operation.
2.5. Alarm output use
If the alarm output is used, the installation, testing, commissioning and
troubleshooting of the unit may only be performed by an electrician
(pursuant to VDE 0100).
DANGER!
Risk to life from live voltage (mains voltage)!
There are unprotected live electric components inside the device.
•
Observe the VDE provisions.
Fig. 2
Probe
1) 3 electrodes on the lower side
2) Connection lead (for evalua-
tion unit)
1
2
Fig. 3 Overview
Evaluation
unit
Probe
The probe stands with all
the three electrodes on the
floor
Mains 230 V
AC, 50 Hz
Evaluation unit beyond
the reach of water