![background image](http://html1.mh-extra.com/html/elsner-elektronik/corlo-touch-knx-5in/corlo-touch-knx-5in_technical-specifications-and-installation-instructions_2396716006.webp)
6
Installation and start-up
Display Corlo Touch KNX 5in
• Status: 22.02.2017 • Technical changes and errors reserved.
Connect KNX bus, auxiliary voltage und where required the connection line inputs to
the display unit.
Fig. 2
Bolt the mounting unit on to the socket. The ar-
row („TOP“) must point upwards.
Two screws (right/left or top/bottom) are enough.
TOP
Fig. 3
If the screw domes of the box used are not cov-
ered with the mounting unit's longitudinal holes,
the mounting unit can alternatively be bolted via
the other holes (e.g. for other installation sys-
tems).
Fig. 4
Example: Boxes from Swiss systems.
Fig. 5
The display unit can now be put in place. The
arrow placed on the back („TOP“) must point
upwards.
Fit the display unit
at the top first
and then en-
gage it
at the bottom
.