
UPServer2.0
ON-LINE DOUBLE CONVERSION
Figure 13 plastic base installation
③If an EBP is needed to be placed in the middle, the assembly of plastic base is similar ,
The difference is that two 1U plastic base extended boards are added in the middle.(as the
following shows)
(
A
)
(
B
)
(
C
)
(
D
)
(E)
(F)
Figure 14
increase EBP plastic base installation
2.
The
installation between UPS and EBPS can be
referred to
Fig.15