ON-LINE DOUBLE CONVERSION
connect the ground cable (not supplied) to the ground bonding screw. See “Rear Covers”
for the location of the ground bonding screw for each model.
7.
If an emergency power-off (disconnect) switch is required by local codes, see “Remote
Emergency Power-off” (REPO) to install the REPO switch before powering on
the UPS.
8.
Continue to “UPS Initial Startup”.
Connecting the EBP(s)
To install the optional EBP(s) for a UPS:
1
. Remove the front cover of each EBP and UPS (see Figure 11).
It is the same with the installation of the front cover. (Refer” To install the UPS “)
Figure10 Removing the EBP Front Cover
2.
On the bottom of the UPS front cover, remove the EBP cable knockout (see Figure 12).
Figure11 Removing the UPS Cable Knockout
3.
For the bottom (or only) EBP, remove the EBP cable knockout on the top of the
EBP front cover. See Figure 13 for the location of the top EBP cable knockout.
4.
If you are installing more than one EBP, for each additional EBP remove the EBP
cable knockout on the top and
bottom of the EBP front cover. See Figure 13 for
the location of the EBP cable knockouts.