background image

 

iS300/iS300D/iS300Solar

 

SWING

 

GATE

 

OPENER

 

MANUAL

 

1.1 GENERAL PRECAUTION

 

 
WARNING: 

This user manual is only for qualified technicians who are specialized in 
installations and automations. 

1)  All installations, electrical connections, adjustments and testing must be 
 

performed only after reading and understanding of all instructions carefully. 

2)  Before carrying out any installation or maintenance operation, disconnect the 
 

electrical power supply by turning off the mains switch connected upstream 

 

and apply the hazard area notice required by applicable regulations. 

3)  Make sure the existing structure is up to standard in terms of strength and 
 stability. 
4)  When necessary, connect the motorized gate to reliable earth system during 

 electricity 

connection 

phase. 

5) Installation 

requires 

qualified personnel with mechanical and electrical skills. 

6)  Keep the automatic controls (remote, push buttons, key selectors.etc) placed 
 

properly and way from children. 

7)  For replace or repair of motorized system, only original parts must be used. 
 

Any damage caused by inadequate parts and methods will be not claimed to 

 motor 

manufacturer. 

8)  Never operate the drive if you suspect that it might be faulty or will cause 
 

damage to the system. 

9)  The motors are exclusively designed for gate opening and closing application, 
 

any other usage is deem inappropriate. The manufacturer will not be liable for 

 

any damage resulting from the improper use. Improper usage should void all 

 

warranty, and the user accepts sole responsibility for any risks thereby may 

 accrue. 
10)  The system may be operated in proper working order. Always follow the 
 

standard procedures by following the instructions in this installation and 

 operating 

manual. 

11)  Only operate the remote when you have the full view of the gate. 
 

ELSEMA PTY LTD shall not be liable for any injury, damage, or any claim to 
any person or property which may result from improper use or installation 
of this system. 

Please keep this installation manual for future reference. 

 
 
 
 
 
 

1

 

Summary of Contents for iS300

Page 1: ...iS300 iS300D iS300Solar SWING GATE OPENER MANUAL iS300 iS300D iS300Solar SWING GATE OPENER USER MANUAL ...

Page 2: ...ARD INSTALLATION P 2 B INSTALLATION CHECK P 3 C REAR BRACKET INSTALLATION P 4 D FRONT BRACKET INSTALLATION P 5 E CHECK BRACKET P 5 F MOTOR FIXING P 6 G WIRE CONNECTION P 6 H EMERGENCY RELEASE P 7 I MECHANICAL STOPPER ADJUSTMENT P 7 1 3 TECHNICAL FEATURES A TECHNICAL FEATURES P 8 B DIMENSION P 8 1 4 MAINTENANCE P 8 ...

Page 3: ... selectors etc placed properly and way from children 7 For replace or repair of motorized system only original parts must be used Any damage caused by inadequate parts and methods will be not claimed to motor manufacturer 8 Never operate the drive if you suspect that it might be faulty or will cause damage to the system 9 The motors are exclusively designed for gate opening and closing application...

Page 4: ...iS300 iS300D iS300Solar SWING GATE OPENER MANUAL 1 2 STANDARD INSTALLATION A STANDARD INSTALLATION 2 ...

Page 5: ...at the motor mounting position on the gate pillar can be done with the measurements in Figure 1 and Graph 2 3 Be sure that gate moves freely 4 There are no obstacles in the moving gate area 5 Hinges are properly positioned and greased 6 There should be no friction between the two gate leafs 7 There should be no friction with the ground while moving the gates 8 Check that the gate structure is suit...

Page 6: ...se values for greater than 90 from Graph 2 Step 2 Before securing the rear bracket to the pillar check the front bracket can be welded to a solid point on the gate leaf Fully close the gate Connect the rear and front brackets to the motor Hold the rear bracket onto the pillar with the calculated A and B values Move the motor in a vertical direction until the fixing zone is in a solid area of the g...

Page 7: ...om the mechanics You should now be able to move the gate manually Slowly fully open and close the gate manually If the gate fully opens and closes the installation of the brackets was done correctly INSTALLATION RULES 1 To prevent the operator from over running its maximum and minimum operating limits the operating stroke Cu Cu A B should always be shorter than the available stroke CD which is 350...

Page 8: ... bracket to the drive unit with the nut provided as shown in no 2 Make sure the iS300 is mounted in a horizontal position especially in these positions 1 Gate in CLOSE position 2 Gate in OPEN position 3 Gate at 45 angle position Prior to welding the bracket on the gate leaf if necessary cover the gate opener to prevent damages from sparks G WIRE CONNECTION To connect the iS300 with the control uni...

Page 9: ...r base Step3 Release the screw on the mechanical stopper to change the position The position of the front and rear mechanical stopper indicates the fully Open Close positions of the gate J ELECTRICAL CONNECTION After successful motor installation refer to the user manual of the control card for automatic operation setup Step1 Slide the lid of the release chamber forward Step2 Insert the key and tu...

Page 10: ...k and make sure that the wire connections are in good condition Connect the power supply 1 Check the power adjustments 2 Check the function of the manual release 3 Check the photocells or other safety device Motor Voltage 24Volts DC motor Gear Type Worm gear Max Absorbed Power 144 Watts Peak Thrust 3000N Nominal Thrust 3000N Stroke Length CD 350mm Power Supply 240 Volts AC Nominal Input Current 2 ...

Page 11: ...iS300 iS300D iS300Solar SWING GATE OPENER MANUAL Service History Date Maintenance Installer 9 ...

Page 12: ...Solar SWING GATE OPENER MANUAL Solar kits Solar panels Backup batteries Photo electric beams Magnetic locks Wireless keypads Pre formed loop Visit www elsema com to see our full range of Gate and Door Automation products ...

Reviews: