background image

 

Maintenance Details 

 

WARNING! 

 

 

    Failure to maintain equipment may result in injury or death and/or damage to property and equipment

 

 

    Recommended maintenance to be performed on the operator and gate are as follows:- 
 

Operator performs over 150 cycles a day 

each month 

 

Operator performs between 100-150 cycles a day 

every 2 month 

 

Operator performs between 50-99 cycles a day 

every 4 months 

 

Operator performs between 20-49 cycles a day 

every 6 months 

 

Operator performs under 20 cycles a day 

every 12 months 

 

    Date:  ..............................................................................  
 
    Site Name: ..................................................................................................................................  
 
    Site Address: ...............................................................................................................................  

 

   

Before

 

commencing maintenance on the operator, isolate the electrical supply to ensure operator will 

not run inadvertently. 

 

 

 

Gate rolls freely when in manual ................................................................................. 

 

 

Gate wheels and guide rollers in good condition.......................................................... 

 

 

Gate stops are installed and in good condition, not loose ............................................ 

 

 

Gate rack is tight & correct clearances between pinion wheel & rack .......................... 

 

 

Gate track is not damaged........................................................................................... 

 

 

Gate operator mounting bolts tight............................................................................... 

 

 

No oil leaks from gearboxes ........................................................................................ 

 

 

Gearbox mounting bolts/nuts tight ............................................................................... 

 

 

Inside operator and control box clean .......................................................................... 

 

 

‘Baygon’ Surface Spray around operator and control box (not on electronics) ............. 

 

 

All electrical connections tight ...................................................................................... 

 

 

Limit Switches operate in appropriate positions ........................................................... 

 

 

External safety devices work effectively / cleaned ....................................................... 

 

 

Electromagnetic lock, if fitted, operates correctly and is clean ..................................... 

 

 

Wash down of control box and cover (particularly near corrosive/sea environments) .. 

 

 

General operation i.e. speed, auto close etc normal .................................................... 

 

    

 Comments............................................................................................................................................. 

  ...................................................................................................................................................... 

…. 

 ............................................................................................................................................................... 

    Service performed by: 
 
.................................................................................................................................................
 

 

Summary of Contents for INTELLIGENT SLIDER iS1500LV

Page 1: ...HIGH SPEED SLIDING GATE OPENER WITH BATTERY BACK UP Model iS1500LV Elsema s Eclipse Control Card USER MANUAL...

Page 2: ...tions are used Display any necessary signs to indicate any danger areas and automatic operation of the gate or door The operators are not designed to be used in any hazardous areas or areas subject to...

Page 3: ...te base approximately 600mm long x 300 wide x 300mm deep should be laid where the gate operator is to be located IMPORTANT ensure there are gate stops firmly installed in the fully open and closed pos...

Page 4: ...een the rack teeth and Pinion wheel 3 Once the rack is fixed move the gate and sight the rack moving over the pinion wheel check that most of the pinion wheel meshes with the rack Make sure rack runs...

Page 5: ...g on them One should have a and the other should have a You cannot use the limit magnets if they have the same marking The magnets can be installed on either side open or close Please see the diagram...

Page 6: ...ening Photo Beam P E N C safety input Can be set for N O operation if needed through menu 3 1 PE beam operation modes can be changed through menu 4 2 Control Outputs 12VDC Supplies regulated 12VDC at...

Page 7: ...now be opened by hand To re engage the clutch move the gate by hand into approx the halfway position and turn the knob clockwise until it is very tight If when turning the knob clockwise and it just...

Page 8: ...r will not run inadvertently Gate rolls freely when in manual Gate wheels and guide rollers in good condition Gate stops are installed and in good condition not loose Gate rack is tight correct cleara...

Reviews: