background image

9

USER MANUAL

Inteli-Mixer RM-2

Example 1. Racks rotates clockwise 180 deg. then 
counter clockwise 270 deg. Store program in 

C1.

1.1 Select 

C1 on F display.

1.2 Hold   button for 4.5 seconds. Rack will auto-

matically find

 00 initial point.

1.3  Pressing clockwise rotation button   set 50 

value on 

RPM indicator, that corresponds to 

180 degrees (see Fig. 3).

1.4  Press enter button   
1.5  Pressing counter clockwise rotation button 

 

 

 turn the rack until 75 value on

 RPM indica-

tor, that corresponds to 270 degrees (see Fig. 
3).

1.6  Press enter button   
1.7  Pressing clockwise rotation button   or coun-

ter clockwise rotation button   se 

00 value 

on 

RPM indicator, F indicator will show P0.

1.8  Press enter button    
Program is successfully recorded.

Example 2.  (Features entering position correction).
Rack rotates clockwise 180 deg., then counter clock-
wise 180 deg., entering position correction in 

00 

deg. point then rotates 90 deg. counter clockwise. 
Store program in 

C2.

2.1 Select 

C2 on F display.

2.2 Hold   button for 4.5 seconds. Rack will auto-

matically find 

00 initial point.

2.3  Pressing clockwise rotation button   set 50 

value on 

RPM indicator, that corresponds to 

180 degrees (see Fig. 3).

2.4  Press enter button 
2.5  Pressing counter clockwise rotation button 

 

 

 turn the rack until 

00 value on RPM indica-

tor.

 

Caution ! 

reaching  00 point automatically is 

offered P0 function that sets end of program. If 

you would like to continue programming do not 

press   button on this step. 

2.6 Choose 

SP function on F display.

2.7  Press enter button   (position correction en-

tered)

2.8  Pressing counter clockwise rotation button 

 

 

 turn the rack until 75 value on 

RPM indica-

tor, that corresponds to 270 degrees (see Fig. 
3).

2.9  Press enter button 

2.10  Pressing clockwise rotation button   or coun-

ter clockwise rotation button    set 

00 value on 

RPM indicator, F indicator will show P0.

2.11   Press enter button 
Program is successfully recorded.(actions 1.5, 1.6, 
1.7 – position correction )

Example  3.  Perform small amplitude shaking ‘u’ 
during 3 sec., then rotate counter clockwise 90 deg., 
then hold 1.5 sec., then shake 1.5 sec. with big am-
plitude ‘

U’ & 1.5 sec. with small amplitude ‘u’, then 

rotate clockwise 180 deg., then rotate counter clock-
wise to the 

00 deg. point and hold 1.5 sec. Store the 

program in 

C3.

3.1 Select 

C1 on F display.

3.2  Hold     button for 4.5 seconds. Rack will au-

tomatically find 

00 initial point.

3.3. Select 

Pu function on F display.

3.4.  Press enter button  . 1.5 sec shaking is en-

tered.

3.5.  Press enter button  . Extra 1.5 sec shaking is 

entered.

3.6. Pressing counter clockwise rotation button   

turn the rack until 75 value on 

RPM indicator, 

that corresponds to 90 degrees (see Fig. 3).

3.7.  Press enter button  .
3.8.  Select PP function on F display 1.5 sec. pause.
3.9.  Press enter button  .
3.10. Select 

PU function on F display 1.5 sec. big 

amplitude shaking.

3.11. Press enter button  .
3.12. Select 

Pu function on F display 1.5 sec. small 

amplitude shaking.

3.13.  Pressing clockwise rotation button   turn the 

rack until 25 value on 

RPM indicator, that cor-

responds to 180 degrees (see Fig. 3).

3.14. Pressing counter clockwise rotation button   

turn the rack until 

00 value on RPM indicator. 

 

Caution ! 

reaching  00 point automatically is 

offered P0 function that sets end of program. If 

you would like to continue programming do not 

press   button on this step.

3.15. Select 

PP function on F display 1.5 sec. pause.

3.16. Press enter button  .
3.17. Select 

P0 function on F display.

3.18. Press enter button  . 
Program is successfully recorded.

Summary of Contents for Inteli-Mixer RM-2

Page 1: ...USER MANUAL RM 2L RM 2M RM 2S elminorthamerica com Inteli Mixer RM 2...

Page 2: ...ms F4 F5 F6 F8 F9 6 Customer programs C1 C2 C3 6 Creating customer programs 6 Introduction 6 Entering programming mode 7 Programming mode 7 Learning to use program steps 8 Spinning 8 Temporary pause 8...

Page 3: ...speed rev min from 1 to 99 Speed selection step rev min 1 Environmental temperature C from 2 to 50 Relative moisture of the atmosphere at the temp 20 C not more than 80 Power adapter input 110 220 V...

Page 4: ...on On is on the top of the control block Power supply socket is on the back side of the control block Rack to motor connector is on the right side of the control block Back holder Base platform START...

Page 5: ...ckwise rotation 1 5 sec Hold in initial point F8 110 clockwise rotation 1 5 sec big amplitude U shaking 110 counter clockwise rotation 1 5 sec Hold in initial point 110 counter clockwise rotation 1 5...

Page 6: ...cy until operation become stable Combined programs F4 F5 F6 F8 F9 These programs are performing different combina tions of rotation and vortexing Current speed is shown on RPM display and can be chang...

Page 7: ...s and displays acquire additional functions See figure 2 During programming mode RPM display shows rack rotation angle relatively to initial position See dia gram on fig 4 Program seletion buttons Ste...

Page 8: ...hile entering long programs it is recommended to enter positioning correction each time we pass 00 vertical position point This can be done by selecting SP function in 00 point F display shows P0 and...

Page 9: ...tor that corresponds to 270 degrees see Fig 3 2 9 Press enter button 2 10 Pressing clockwise rotation button or coun ter clockwise rotation button set 00 value on RPM indicator F indicator will show...

Page 10: ...g buttons select operation program see Intelli mixer program overview table Set rotation speed and shaking intensity see using mixing programs Note Operation programs can be selected either during ope...

Page 11: ...emory is empty Enter a new custom program See creating custom programs Disinfection and cleaning Before you start disinfection or cleaning make sure the power adapter is unplugged It is recommended to...

Page 12: ...harges are applied to the con sumer For all further questions concerning exploitation and maintenance please Contact manufacturer or product vendor Certificate of approval Inteli Mixer RM 2 ____ N0 __...

Reviews: