98557C (Rev. J - 8/14)
Page 4
EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A
INSTALLATION INSTRUCTIONS
1.
Install mounting frame. See mounting frame instructions.
2.
Install remote chiller. See chiller instructions.
3.
EWF3000 WATERSENTRY PLUS FILTER INSTALLATION
(
Filtered units only. For non filtered units proceed to step 4b
)
NOTICE: Do not use with water that is microbiologically unsafe or of
unknown quality without adequate disinfection before or after the system.
1)These filter kits must be installed in compliance with all state and local laws
and regulations governing the installation and use of this product. Maximum
inlet water temperature 100°F (38°C).
2) See filter instructions for filter assembly. Insert 3/8" elbow fitting into the
inlet side of filter head, insert 1/4" polytube or 1/4" x 90° elbow into outlet
of filter head prior to mounting the filter head assembly into the remote chiller.
3) Mount filter head to the side of the remote chiller using the filter mounting bracket and screws supplied.
CAUTION: If supply pressure will ever exceed 100 psi, install a pressure
regulator to limit the inlet pressure to the filter to 100 psi or below.
DO NOT ATTACH HOT WATER LINE TO FILTER.
To make connections on the
filter head, loosen locknut. Push the tube end past both o-rings to a positive
stop in the filter head recess - approx. 1", locknut may have to be backed out a
little more. Screw the locknut hand tight to seal (See Fig. 5). Ends of tubing
must be cut square and free of burrs and sharp ends that could cut or nick the o-rings.
TO BOTTLE FILLER
CHILLER
INLET
PLUMBING DIAGRAM
FIG. 6
4a. Make water supply connections for Fltered units. Install a shut-off valve and union connection to building water supply
(valve and union not provided). Turn on the water supply and flush the line thoroughly.
4b. Make water supply connections for Non Fltered units. Install a shut-off valve and union connection to building water
supply (valve and union not provided). Turn on the water supply and flush the line thoroughly. Install the in-line strainer
between the valve and the cooler. The in-line strainer is not installed on filtered units.
5.
(
Filtered units only. For non filtered units proceed to step 7
)
Make connection between filter head and building supply line. Insert the 3/8" water line into the inlet side of the filter
head by pushing it in until it reaches a positive stop, approximately 3/4" (19mm). Install two 1/4" x 1/4" unions (provided)
on the chiller. One on the inlet tube, and the other on the outlet tube.
6.
Make connection between the filter head and the remote chiller. Insert end of 1/4" O.D. poly tubing from the filter head
(provided) into union on chiller inlet.
7.
Mount the upper panel to the mounting frame, aligning holes in the hinge brackets with holes in the mounting frame
(three places). Mount with adequate size screws (not provided). Close the door and verify that the lock brackets on the
side and bottom of the panel align with the slots on the mounting frame. Also verify that the panel is hanging high enough
that it covers the top of the mounting frame. If adjustments need to be made, open the door and loosen the three screws
on the hinge and adjust accordingly and then retighten the screws.
8.
Connect water line from the water station by inserting the 1/4" O.D. poly tubing into the union on the chiller outlet.
9.
Close the upper door and attach the drain fittings to drain tube. Re-attach elbow to p-trap and cut waste tube to
required length using plumbing hardware and trap as a guide.
NOTE: SCREW THE LOCKNUT
HAND TIGHT TO SEAL
FIG. 5
FILTER
CHILLER
TO BOTTLE FILLER
INLET
STRAINER
NON FILTERED
FILTERED