background image

Rev.010521DT (DS0189) 

www.elitescreens.com

 

3

 

 

SCREEN INSTALLATION 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 frame B

 

⑰ 

Frame C

 

 frame B

 

② 

Frame A

 

② 

Frame A

 

⑰ 

Frame C

 

 

1.

 

 Long Center Joints a 

 

 Long Center Joints b

 

 M5x6 Screws 

 M5x6 Screws 

 Elbow Joints b 

 Elbow  

Joints a 

 

 

2.

 

Note: the support bar is mounted in the upper and lower border 
splicing direction as shown on the right 

1.Loosen the screw on the 

support bar (the connecting 
piece can slide). 

2.Adjust the connector to 

align its hole position with 
the border hole position. 

3.Fix with 

 M4X4 screws.

 

Frame

 

M4x 4 

screws

 

Support 

bar

 

1

Frame Assembly 

 

2

Center Support Bar Installation 

Summary of Contents for EDGE FREE Aeon CineGrey 4D AT Series

Page 1: ...ghting It was designed to enhance picture brightness offer accurate color fidelity improve contrast and allow sound to pass through In order for the CineGrey 4D AT material to maintain its projection qualities and provide optimum performance please refer to the list below for proper maintenance and cleaning The following precautions should always be followed to avoid damaging the material which is...

Page 2: ...m A Long Center Joints b Elbow Joints a Support bar Frame A Short Center Joints Elbow Joints b Spring a Wall Bracket M4x4 Screws Elbow Joints C Spring b Anchor M5x6 Screws Corner Cover Fiberglass rod Wood Screws Edge Trim B Frame C Screen material Long Center Joints a Frame B Edge Trim C 23 22 21 Exploded View of Aeon Frame Wall installation ...

Page 3: ...ow Joints b Elbow Joints a 2 Note the support bar is mounted in the upper and lower border splicing direction as shown on the right 1 Loosen the screw on the support bar the connecting piece can slide 2 Adjust the connector to align its hole position with the border hole position 3 Fix with M4X4 screws Frame M4x4 screws Support bar 1 Frame Assembly 2 Center Support Bar Installation ...

Page 4: ...d place a small suitable weighted object at the end of the material 3 Lay the material face down two people carefully lift the rolled end and slowly rotate the material clockwise 4 Insert the corresponding fiberglass rods on thru the sleeves on the edges of the material Fiberglass rod a1 a2 35mm Backside of screen 22 Note Please install the six fiber rods into the frame 1 Carefully and gently plac...

Page 5: ...hen fasten them with the M4 x 4 screws 4 Attach a spring b on the middle of each edge trim 1 6 to the frame as shown in the illustration 5 Insall the corner covers on the four corners of the edge trim 3 Begin by simultaneously attaching three springs in the center of the side frames C D and repeat for top bottom frames A B 4 Then simultaneously attach the springs from the center to all corners Lea...

Page 6: ...1 mm 125 109 7 2788 mm 108 9 2768 mm 62 1 1578 mm 61 3 1558 mm 135 118 5 3010 mm 117 7 2990 mm 67 1702 mm 66 2 1682 mm 150 131 5 3342 mm 130 7 3322 mm 74 3 1889 mm 73 5 1869 mm Screen size 110 125 135 150 L Left Right hole distance 59 1500 mm 78 7 2000 mm 78 7 2000 mm 98 4 2500 mm H Top Bottom hole distance 47 5 1209 mm 54 9 1395 mm 59 8 1519 mm 67 1 1706 mm 6 Wall installation H Wood screws Ancho...

Page 7: ...e frame s channel per example below 2 Then pull up the screen on the top bracket and adjust the screen left to right as needed For an Elite Screens contact and technical support in your area please visit www elitescreens com Frame installed on top bracket 1 Do not fasten the screws on the bottom bracket to allow screen to move up and down Frame installed on bottom bracket ...

Reviews: