Elite Screens EB110HW2-E12 User Manual Download Page 8

Rev.060116-D 

www.elitescreens.com

 

 

 

 

4.

 

Insert the 

threaded rods

(C) through the 

M8 expanding bolts

 and then attach the 

M8x40mm 

hexagonal screws 

with the 

washer 

(E). Last put the 

Hanging Bracket

 (B) through the threaded rod 

equal to the height of the screen’s housing. Once they are firmly in place (as shown below) make sure 
that they will hold the weight of the screen. 

 
 
 
 
 
 

 

 

 
 

 

 

 

 
 

  
 
5.

 

Push the screen up into the space. Use the 

threaded rods

 (C) to attach the screen assembly to the 

ceiling. The 

hexagonal screws

 (E) will connect the screen to the rest of the assembly. Once firmly in 

place; use the 

nuts

 (F) to ensure a firm connection. Use the 

socket wrench

 (D) to make sure that the 

bolts are firmly tightened. 
 

 

 
 
 

 
 
 
 
 
 
 

6.

 

Install 

end flange cover panel

 (A) between the gap and the screen to complete the installation. 

 
 
 
 
 
 
 

 
 

For local Elite Screens contact or Technical Support, please visit 

www.elitescreens.com

 

Ceiling

 

Socket wrench (H)

 

Ceiling 

 

E and F

 

Push

 

Push the screen to 
the hole of the 
ceiling

the 

screw across the 
hole of the end 
cap. 

Use the Socket wrench 
to attach the washer 
and the outside 
hexscrews, and then 
adjust the bottom of 
the screen to make it 
parallel with the 
ceiling, and then fasten 
the screw. 

Summary of Contents for EB110HW2-E12

Page 1: ...ion direct connection to a properly grounded power source is advised The power outlet supplying power to the unit should be close to the unit and easily accessible Do not install the unit on uneven in...

Page 2: ...is equipment has been tested and found to comply with the limits for a Class B digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against ha...

Page 3: ...te control Item A Fig 1 The Infrared functions by direct line of sight contact with a beam range of 30 feet Aim the IR remote at the eye receiver once it has been connected to the control box s RJ45 p...

Page 4: ...steps again if not successful Please be aware the projector on off cycle may take longer to fully activate It usually takes around 20 30seconds for full off and on cycle each time Hardware Parts List...

Page 5: ...or some countries for use in a non concealed power outlet If your installation will be entirely concealed including power outlet Elite Screens strongly recommends a hardwire connection Please refer to...

Page 6: ...e piece C on the edge of the housing as shown below to complete the assembly The screen is now ready for installation B Below ceiling installation instructions Please make sure all parts listed below...

Page 7: ...sizes The width should be 120mm The length of A5 in the diagram below depicts the distance between the holes located on each ear end of the screen s case 3 The M8expanding bolts G mount into thick woo...

Page 8: ...s E will connect the screen to the rest of the assembly Once firmly in place use the nuts F to ensure a firm connection Use the socket wrench D to make sure that the bolts are firmly tightened 6 Insta...

Reviews: