Rev.060116-D
6
2.
Place the
Suspension Bar
(B) over the
Hanging Bracket
(A) and align with the hole as shown
below according to the height requirement for your installation area. Secure the
Suspension Bar
(B) with the
M6x20mmScrew
(B),
M6x13mmx2mmWasher
(E) and the
M6 Nut
(F). Repeat
the process for the other side.
3. Insert the
end flange piece
(C) on the edge of the housing as shown below to complete the assembly.
The screen is now ready for installation.
B.
Below ceiling installation instructions
Please make sure all parts listed below are included before proceeding with the installation.
Hardware Parts List for below ceiling installation
A. End Flange x 2
B. Hanging bracket x 2
C. Threaded rod x 4
D. Socket wrench x 1
E. M8x16mmx1.5mm
washer x 28
F. M8 nut x 20
G.M8 Top expanding bolt x 4
H. M8x40mm hex screw x 4
H
D
F
Push end flange piece into
housing end until it snaps in
B
A