background image

Rev.08232021JA                                                

www.elitescreens.com

                        

U-00235 

3

 

 
Frame Assembly 

Step 1

:  Place the included soft padded sponge sheet on a clean area where the screen will be assembled. 

Step 2: 

Position the pieces of the frame on the sponge sheet in the arrangement shown below 

 

 

 

 

Step 3: 

Insert 

center joint (a/b) 

connectors into 

one-half of the horizontal frame (B/C)

 and secure with the 

M4x7 

screws (M)

 as shown in the illustration below.  

Tip: The center joint (b) with the larger diameter holes should be on top. 

 

 

 

 

 

 

Step 4: 

Connect the 

elbow joints (c/d)

 to the top and bottom sections of the vertical frame. Once inserted, connect 

the vertical sections to the horizontal frame sections. Make sure all holes are in alignment and the frame pieces are 

flush (no gaps). They should form perfect right angles.  

Tip: The elbow joint (d) with the larger diameter holes should be on top. 

Item 

Parts List 

103” 

123” 

135” 

150” 

a. 

Center Joints- M4 (bottom position) 

b.

 

Center Joints-D5 (top position) 

c. 

Elbow Joints M4 (bottom position) 

d. 

Elbow Joints D5 (top position) 

e. 

Side cover Center Joints- M4 

f. 

Side cover Elbow Joints M4 

g. 

M4x7 Screws 

24 

24 

24 

24 

h. 

Spring 

52 

60 

68 

72 

i. 

Spring Hook 

2

 

j. 

wall brackets 

k. 

Φ5x50 Wall Screws 

8

 

8

 

l. 

Hollow Wall anchors 

m. 

M4x4 Screws 

24 

24 

24 

24 

n. 

Angle cover 

4

 

o. 

Center Support Bar 

p. 

White gloves 

q. 

Spring 

r. 

Φ3 mm Long Iron (sides) rod/ Short rod (top/bottom) 

2/4 

2/4 

2/4 

2/4 

c. 

d. 

b. 

a. 

a. 

b. 

g.

Sponge Sheet 

Sponge Sheet 

Summary of Contents for Aeon CineWhite A8K Series

Page 1: ...ransparent for front projection It is precisely formulated for high resolution projectors to offer accurate color fidelity but also designed to allow speaker placement behind the screen while its bonded black backing reduces light loss to enhance contrast In order for the CineWhite A8K to maintain its projection qualities and optimum performance please refer to the list below for proper maintenanc...

Page 2: ...rim Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a M4 4 b D5 4 c M4 4 d D5 4 e M4 4 f M4 4 g h i j k l m n o p q r Red Black ...

Page 3: ...sections Make sure all holes are in alignment and the frame pieces are flush no gaps They should form perfect right angles Tip The elbow joint d with the larger diameter holes should be on top Item Parts List 103 123 135 150 a Center Joints M4 bottom position 2 2 2 2 b Center Joints D5 top position 2 2 2 2 c Elbow Joints M4 bottom position 4 4 4 4 d Elbow Joints D5 top position 4 4 4 4 e Side cove...

Page 4: ...leeves according to their corresponding lengths on each edge of the screen as shown below The short rods top bottom will overlap to secure a firm grasp in the middle areas Step 8 Carefully and gently place the assembled frame on top of the screen material in the marked areas as shown below Make sure to not allow the angle edge of the frame to come in direct contact with the screen material to avoi...

Page 5: ... the groove of the frame use the spring hook h to attach the spring to the hole located on the screen material s outer edge in the following order Begin by first attaching the center points on both vertical left right sides steps 1 2 Then the center points on both horizontal top bottom sides steps 3 4 Once all center points have been secured make sure the screen material is still within the marked...

Page 6: ...so that it lies flat and wraps along the edge of the frame and reattach springs to the material Note Please make note of the yellow label and spring in the center of the frame This is an indicator to start the screen material installation process from the middle area of the frame How to avoid getting ripples on the screen s material surface Solution Pull and smooth out the material using your hand...

Page 7: ...d attach the vertical left right sides edge trim frames d using the elbow joints f and secure with four M4x4 screws m on all corners Step 2 Step 12 Install the angle cover n on each corner of the frame using the M4x4 screws m Note The angle cover screws holes align with the screw holes on the elbow joint Step 13 Install the springs q in each middle area to further support the bezel trim edge frame...

Page 8: ...s with a screwdriver Make sure the brackets are leveled Step 15 Position the fixed frame screen onto the top wall brackets as shown below and push down at the center of the top of the frame to secure For Technical Support or an Elite Screens contact in your area visit www elitescreens com Model Size X Wall bracket distance X1 Bracket hole distance Y Top Bottom Wall Bracket Height AR103H 1200mm 47 ...

Reviews: